Install SV-26-0405 docket D40274 10 Aug 2026 · PM
Newman Health Campus Upgrade
Newman Dr, Newman 6753
Checked off by the office
The quantities are posted and the running total on this site has been updated. Sent 10 Aug 2026, 5:56 pm.
What went in
Put in what you actually installed, not what was on the run sheet.
Temporary Fence — Standard Braced
TF-BRC · metres
+705.6 m
Total Block Out Screening
SC-BLOK · metres
+837 m
Bracing Kit
BRC-KIT · each
+128
Fence Foot — Concrete Block
FT-BLOK · each
+658
Fence Clamp — Standard
CLP-STD · each
+559
Barbed Wire Coil — 100m
BW-COIL · each
+10
Site Safety Sign
SIGN-SITE · each
+14
Containment Bin — 3m³
BIN-3 · each
+4
Photos
Before and after. If they ever say it wasn't done, this is what settles it.
Before
Before
Frontage before we started
After
After
Completed run, gate at the west end