St John of God Midland — East Wing
CREW-5 · Luke · Friday 14 August
Crew
Install SV-26-0406 docket D40281 12 Aug 2026 · All day

St John of God Midland — East Wing

1 Clayton St, Midland 6056

Checked off by the office

The quantities are posted and the running total on this site has been updated. Sent 12 Aug 2026, 4:23 pm.

What went in

Put in what you actually installed, not what was on the run sheet.

Temporary Fence — Standard Braced
TF-BRC · metres
+283.2 m
Bracing Kit
BRC-KIT · each
+38
Fence Foot — Plastic Filled
FT-PLAS · each
+226
Fence Clamp — Standard
CLP-STD · each
+233
Site Safety Sign
SIGN-SITE · each
+5
Pedestrian Gate Panel
GT-PED · each
+3
Vehicle Gate — 6m Double Swing
GT-VEH · each
+2

Photos

Before and after. If they ever say it wasn't done, this is what settles it.

No photos on this one yet.