Final collection SV-26-0444 docket D40423 29 June 2026 · All day
Collie Battery Site — Perimeter
Coalfields Hwy, Collie 6225
Final collection — billed on the install invoice
Checked off by the office
The quantities are posted and the running total on this site has been updated. Sent 29 June 2026, 4:01 pm.
What came off site
Count it as you load it. Anything bent or missing, say so — it gets charged on.
Temporary Fence — Standard Braced
TF-BRC · metres
−736.8 m
Temporary Fence — Standard Braced
TF-BRC · metres
−24 m
Damaged
Foot cracked
Temporary Fence — Standard Braced
TF-BRC · metres
−14.4 m
Missing
Never located
Total Block Out Screening
SC-BLOK · metres
−385 m
Bracing Kit
BRC-KIT · each
−79
Bracing Kit
BRC-KIT · each
−2
Damaged
Frame twisted
Fence Foot — Concrete Block
FT-BLOK · each
−367
Fence Clamp — Standard
CLP-STD · each
−399
Fence Clamp — Standard
CLP-STD · each
−12
Damaged
Mesh pushed in
Barbed Wire Coil — 100m
BW-COIL · each
−7
Site Safety Sign
SIGN-SITE · each
−8
Containment Bin — 3m³
BIN-3 · each
−3
Photos
Before and after. If they ever say it wasn't done, this is what settles it.
Damage
Damage
Damage on return — charged on