Calendar
Every delivery and collection, by truck. Drag a job onto a day and a truck; drag it up or down to set the order the crew drives it in. The crew's iPad shows the same run in the same order. This replaces the run sheet.
InstallAddCollectFinal collectionRepairInspection 0 m of fence moving
| Truck | Monday 12 September 12 Sept 1988 | Tuesday 13 September 13 Sept 1988 | Wednesday 14 September 14 Sept 1988 | Thursday 15 September 15 Sept 1988 | Friday 16 September 16 Sept 1988 | Saturday 17 September 17 Sept 1988 | Monday 19 September 19 Sept 1988 |
|---|---|---|---|---|---|---|---|
| Truck 1 Isuzu FRR 110-260 tray | | | | | | | |
| Truck 2 Hino 500 crane truck | | | | | | | |
| Truck 3 Isuzu FVZ 260-300 + dog | | | | | | | |
| Needs a truck not going out until it is on one | | | | | | | |
Book a visit
Goes straight onto the calendar and the truck's iPad. Nothing moves until the crew has been and the docket is in.