Calendar
Every delivery and collection, by truck. Drag a job onto a day and a truck; drag it up or down to set the order the crew drives it in. The crew's iPad shows the same run in the same order. This replaces the run sheet.
InstallAddCollectFinal collectionRepairInspection 0 m of fence moving
| Truck | Friday 14 September 14 Sept 1990 | Saturday 15 September 15 Sept 1990 | Monday 17 September 17 Sept 1990 | Tuesday 18 September 18 Sept 1990 | Wednesday 19 September 19 Sept 1990 | Thursday 20 September 20 Sept 1990 | Friday 21 September 21 Sept 1990 |
|---|---|---|---|---|---|---|---|
| Truck 1 Isuzu FRR 110-260 tray | | | | | | | |
| Truck 2 Hino 500 crane truck | | | | | | | |
| Truck 3 Isuzu FVZ 260-300 + dog | | | | | | | |
| Needs a truck not going out until it is on one | | | | | | | |
Book a visit
Goes straight onto the calendar and the truck's iPad. Nothing moves until the crew has been and the docket is in.