Calendar
Every delivery and collection, by truck. Drag a job onto a day and a truck; drag it up or down to set the order the crew drives it in. The crew's iPad shows the same run in the same order. This replaces the run sheet.
InstallAddCollectFinal collectionRepairInspection 0 m of fence moving
| Truck | Tuesday 2 March 02 Mar 1993 | Wednesday 3 March 03 Mar 1993 | Thursday 4 March 04 Mar 1993 | Friday 5 March 05 Mar 1993 | Saturday 6 March 06 Mar 1993 | Monday 8 March 08 Mar 1993 | Tuesday 9 March 09 Mar 1993 |
|---|---|---|---|---|---|---|---|
| Truck 1 Isuzu FRR 110-260 tray | | | | | | | |
| Truck 2 Hino 500 crane truck | | | | | | | |
| Truck 3 Isuzu FVZ 260-300 + dog | | | | | | | |
| Needs a truck not going out until it is on one | | | | | | | |
Book a visit
Goes straight onto the calendar and the truck's iPad. Nothing moves until the crew has been and the docket is in.