Calendar
Every delivery and collection, by truck. Drag a job onto a day and a truck; drag it up or down to set the order the crew drives it in. The crew's iPad shows the same run in the same order. This replaces the run sheet.
InstallAddCollectFinal collectionRepairInspection 0 m of fence moving
| Truck | Saturday 24 March 24 Mar 2029 | Monday 26 March 26 Mar 2029 | Tuesday 27 March 27 Mar 2029 | Wednesday 28 March 28 Mar 2029 | Thursday 29 March 29 Mar 2029 | Friday 30 March 30 Mar 2029 | Saturday 31 March 31 Mar 2029 |
|---|---|---|---|---|---|---|---|
| Truck 1 Isuzu FRR 110-260 tray | | | | | | | |
| Truck 2 Hino 500 crane truck | | | | | | | |
| Truck 3 Isuzu FVZ 260-300 + dog | | | | | | | |
| Needs a truck not going out until it is on one | | | | | | | |
Book a visit
Goes straight onto the calendar and the truck's iPad. Nothing moves until the crew has been and the docket is in.