J-26-0002
On siteTest site 1234 · Test Site, Perth City · Standard · Building & construction
The job
from the accepted quote Q-26-0002 — what's needed on site, and every task to get it thereAdded up from 3 completed visits — every delivery, addition, part collection and final collection. Nobody counted anything.
- Hire started
- 20 Oct 2026
- Hire ends
- Open — billed monthly
- Billed
- Monthly per item, in arrears
- Their PO / reference
- Not provided
- Next visit
- none booked
- Site contact
- test 08 9430 1180
› Estimated, loaded and installed — line by line what they asked for, what the truck took, what went in
| Item | Estimated | Loaded | Installed | Added | Collected | Missing | Damaged | On site now |
|---|---|---|---|---|---|---|---|---|
| Temporary Fence — Standard TF-STD · 2.4 m panels | 120 m | 120 m | 120 m | +19.2 m | −19.2 m | — | — | 120 m |
| Fence Shoe — Plastic Filled FT-PLAS | 50 | 50 | 50 | +8 | −8 | — | — | 50 |
| Fence Clamp CLP-STD | 50 | 50 | 50 | +8 | −8 | — | — | 50 |
| Fence, metres | 120 m | 120 m | 120 m | +19 m | −19 m | — | — | 120 m |
Installed + added − collected − missing − damaged = on site now, line by line. They asked for 120 m, the truck took 120 m, and 120 m went in — the first invoice bills what went in, not the estimate.
Ins and outs
every delivery, extra delivery, part collection and loss on this site — click one to see what moved›20 Oct Delivery docket D46117 · Truck 2 +50 panels · 120 m 50panels120 m —
| Equipment | In | Out | Lost | Damaged | On site after |
|---|---|---|---|---|---|
| Temporary Fence — Standard | +50 panels | — | — | — | 50 panels |
| Fence Shoe — Plastic Filled | +50 | — | — | — | 50 |
| Fence Clamp | +50 | — | — | — | 50 |
Crew note: Recorded by the office
›20 Oct Additional delivery docket D46116 · Truck 2 +8 panels · 19 m 58panels139 m INV-26-0010
| Equipment | In | Out | Lost | Damaged | On site after |
|---|---|---|---|---|---|
| Temporary Fence — Standard | +8 panels | — | — | — | 58 panels |
| Fence Shoe — Plastic Filled | +8 | — | — | — | 58 |
| Fence Clamp | +8 | — | — | — | 58 |
Crew note: Recorded by the office
Open the docket · on INV-26-0010 ($242.60 ex GST, waiting for approval)
›20 Oct Part collection docket D46089 · Truck 2 −8 panels · 19 m 50panels120 m INV-26-0011
| Equipment | In | Out | Lost | Damaged | On site after |
|---|---|---|---|---|---|
| Temporary Fence — Standard | — | −8 panels | — | — | 50 panels |
| Fence Shoe — Plastic Filled | — | −8 | — | — | 50 |
| Fence Clamp | — | −8 | — | — | 50 |
Crew note: Recorded by the office
Open the docket · on INV-26-0011 ($185.00 ex GST, waiting for approval)
| Part | Went out | Came back | Lost | Damaged | On site now |
|---|---|---|---|---|---|
| Temporary Fence — Standard | +139.2 m · 58 panels | −19.2 m · 8 panels | — | — | 120 m · 50 panels |
| Fence Shoe — Plastic Filled | +58 | −8 | — | — | 50 |
| Fence Clamp | +58 | −8 | — | — | 50 |
| Fence, in metres | +139 m | −19 m | — | — | 120 m |
Went out − came back − lost − damaged = on site now, for every part. Added up from every completed visit; nobody counts.
How it got there
metres on site after each visitThe hire
- Booked
- 20 Oct 2026
- Billed
- Monthly per item, in arrears
- Shoes per brace
- 3
- Invoiced on this job
- $1,550.48
- Booked by
- KD
- From quote
- Q-26-0002
Every visit
including inspections, repairs and what is booked — with photos, dockets and crews Put out more / take some back
| Date | Visit | Truck · crew | Docket | What moved | Net metres | On site after | Photos | Invoice |
|---|---|---|---|---|---|---|---|---|
| 20 Oct 2026 2:19 pm | Collect | Truck 2 Crew 2 — Brad | D46089 Submitted | −19.2 m TF-STD −8 FT-PLAS −8 CLP-STD | −19.2 m | 120 m | — | INV-26-0011 |
| 20 Oct 2026 2:12 pm | Add | Truck 2 Crew 2 — Brad | D46116 Submitted | +19.2 m TF-STD +8 FT-PLAS +8 CLP-STD | +19.2 m | 139 m | — | INV-26-0010 |
| 20 Oct 2026 2:10 pm | Install | Truck 2 Crew 2 — Brad | D46117 Approved | +120 m TF-STD +50 FT-PLAS +50 CLP-STD | +120 m | 120 m | — | — |
Invoices raised on this job
Account customer — invoiced on 14 days| Invoice | What for | Issued | Period | Status | Ex GST |
|---|---|---|---|---|---|
| INV-26-0004 | Install | 20 Oct 2026 | 25 Oct – — | Draft | $580.00 |
| INV-26-0010 | Variation | 20 Oct 2026 | 20 Oct – — | Draft | $242.60 |
| INV-26-0011 | Variation | 20 Oct 2026 | — | Draft | $185.00 |
| INV-26-0013 | Monthly hire | 20 Nov 2026 | 20 Oct – 20 Nov | Draft | $271.44 |
| INV-26-0014 | Monthly hire | 20 Nov 2026 | 20 Oct – 20 Nov | Draft | $271.44 |
| Billed on this job · $0.00 of it paid | $1,550.48 | ||||
Customer
- Contact
- Jordan Ellery
- Phone
- 08 9430 1180
- ABN
- 31 655 210 448
- Segment
- Events & crowd control
Account customer, so this job is invoiced once the install is done and falls due on 14 days.
New Year and long-weekend festivals. Barrier, stage barrier and bins.
Photos and paperwork
nothing filed against this site yet| Docket | Visit | When | Crew | Signed on site by | State | |
|---|---|---|---|---|---|---|
| D46116 | SV-26-0005 Add | 20 Oct 2026 | CREW-2 | — | Submitted | |
| D46117 | SV-26-0004 Install | 20 Oct 2026 | CREW-2 | — | Approved | |
| D46089 | SV-26-0011 Collect | 20 Oct 2026 | CREW-2 | — | Submitted |
Everything here is held with the job, not in a folder somewhere — so it is still attached to this site in two years when somebody asks what the frontage looked like before the crew started.
Conversation on this job
4 messages — everything said about this, in one place- Out Email Delivery docket D46089 — Test site 1234 20 Oct 2026, 2:19 pmAll Fence U Rent Pty Ltd → test
Hi test, We've collected part of the equipment at Test site 1234 today — docket D46089. On this docket: − 19.2 m (8 panels) Temporary Fence — Standard − 8 Fence Shoe — Plastic Filled − 8 Fence Clamp On site now: 50 Fence Clamp 50 Fence Shoe — Plastic Filled 120 m (50 panels) Temporary Fence — Standard You'll get the invoice within 24 to 48 hours. All Fence U Rent Pty Ltd 0408 877 300
- Out Email Delivery docket D46116 — Test site 1234 20 Oct 2026, 2:13 pmAll Fence U Rent Pty Ltd → test
Hi test, We've delivered the extra equipment at Test site 1234 today — docket D46116. On this docket: + 19.2 m (8 panels) Temporary Fence — Standard + 8 Fence Shoe — Plastic Filled + 8 Fence Clamp On site now: 58 Fence Clamp 58 Fence Shoe — Plastic Filled 139.2 m (58 panels) Temporary Fence — Standard You'll get the invoice within 24 to 48 hours. All Fence U Rent Pty Ltd 0408 877 300
- Out Email Delivery docket D46117 — Test site 1234 20 Oct 2026, 2:10 pmAll Fence U Rent Pty Ltd → test
Hi test, We've delivered and installed at Test site 1234 today — docket D46117. On this docket: + 120 m (50 panels) Temporary Fence — Standard + 50 Fence Shoe — Plastic Filled + 50 Fence Clamp On site now: 50 Fence Clamp 50 Fence Shoe — Plastic Filled 120 m (50 panels) Temporary Fence — Standard You'll get the invoice within 24 to 48 hours. All Fence U Rent Pty Ltd 0408 877 300
- In Website form Accepted — Q-26-0002 20 Oct 2026, 1:59 pmtest → us
test accepted quote Q-26-0002 for Test site 1234. Requested install date: 25 Oct 2026