J-26-0002

On site

Test site 1234 · Test Site, Perth City · Standard · Building & construction

Put out more / take some back

The job

from the accepted quote Q-26-0002 — what's needed on site, and every task to get it there
Needed on site
120 m of standard fence · 50 panels
with 50 shoes, 50 clamps — they go with the panels
Put up so far
139 m
On site now
120 m
Still to go up
—
Beyond the quote
+19 m
Needs sign-off0
—
To assign0
—
With the crew0
—
Done3
Put up 120 m of standard fence (50 panels)
SV-26-0004
✓ Done 20 Oct 2026 · Crew 2 — Brad
In the price — nothing more to invoice
Put out 19 m more standard fence (8 panels)
SV-26-0005
✓ Done 20 Oct 2026 · Crew 2 — Brad
Take back 19 m of standard fence (8 panels)
SV-26-0011
✓ Done 20 Oct 2026 · Crew 2 — Brad
Need more on site, or some back?
How much is on site — right now
120 m of standard fence
50 Fence Clamp 50 Fence Shoe — Plastic Filled 120 m Standard · 50 panels

Added up from 3 completed visits — every delivery, addition, part collection and final collection. Nobody counted anything.

Hire started
20 Oct 2026
Hire ends
Open — billed monthly
Billed
Monthly per item, in arrears
Their PO / reference
Not provided
Next visit
none booked
Site contact
test 08 9430 1180
› Estimated, loaded and installed — line by line what they asked for, what the truck took, what went in
ItemEstimatedLoadedInstalledAdded CollectedMissingDamagedOn site now
Temporary Fence — Standard
TF-STD · 2.4 m panels
120 m 120 m 120 m +19.2 m −19.2 m — — 120 m
Fence Shoe — Plastic Filled
FT-PLAS
50 50 50 +8 −8 — — 50
Fence Clamp
CLP-STD
50 50 50 +8 −8 — — 50
Fence, metres 120 m 120 m 120 m +19 m −19 m — — 120 m

Installed + added − collected − missing − damaged = on site now, line by line. They asked for 120 m, the truck took 120 m, and 120 m went in — the first invoice bills what went in, not the estimate.

Ins and outs

every delivery, extra delivery, part collection and loss on this site — click one to see what moved
›20 Oct Delivery docket D46117 · Truck 2 +50 panels · 120 m 50panels120 m —
EquipmentInOutLostDamagedOn site after
Temporary Fence — Standard +50 panels — — — 50 panels
Fence Shoe — Plastic Filled +50 — — — 50
Fence Clamp +50 — — — 50

Crew note: Recorded by the office

Open the docket

›20 Oct Additional delivery docket D46116 · Truck 2 +8 panels · 19 m 58panels139 m INV-26-0010
EquipmentInOutLostDamagedOn site after
Temporary Fence — Standard +8 panels — — — 58 panels
Fence Shoe — Plastic Filled +8 — — — 58
Fence Clamp +8 — — — 58

Crew note: Recorded by the office

Open the docket · on INV-26-0010 ($242.60 ex GST, waiting for approval)

›20 Oct Part collection docket D46089 · Truck 2 −8 panels · 19 m 50panels120 m INV-26-0011
EquipmentInOutLostDamagedOn site after
Temporary Fence — Standard — −8 panels — — 50 panels
Fence Shoe — Plastic Filled — −8 — — 50
Fence Clamp — −8 — — 50

Crew note: Recorded by the office

Open the docket · on INV-26-0011 ($185.00 ex GST, waiting for approval)

Running total — every part on site now 120 m of fence
120 m · 50 panels Temporary Fence — Standard50 Fence Shoe — Plastic Filled50 Fence Clamp
PartWent outCame backLostDamagedOn site now
Temporary Fence — Standard +139.2 m · 58 panels −19.2 m · 8 panels — — 120 m · 50 panels
Fence Shoe — Plastic Filled +58 −8 — — 50
Fence Clamp +58 −8 — — 50
Fence, in metres +139 m−19 m—— 120 m

Went out − came back − lost − damaged = on site now, for every part. Added up from every completed visit; nobody counts.

Monthly per item, in arrears. The next hire invoice is drafted — INV-26-0014 is waiting for approval.
Check INV-26-0014

How it got there

metres on site after each visit

The hire

Booked
20 Oct 2026
Billed
Monthly per item, in arrears
Shoes per brace
3
Invoiced on this job
$1,550.48
Booked by
KD
From quote
Q-26-0002

Every visit

including inspections, repairs and what is booked — with photos, dockets and crews Put out more / take some back
DateVisitTruck · crewDocketWhat movedNet metresOn site afterPhotosInvoice
20 Oct 2026
2:19 pm
Collect Truck 2
Crew 2 — Brad
D46089
Submitted
−19.2 m TF-STD −8 FT-PLAS −8 CLP-STD
−19.2 m 120 m — INV-26-0011
20 Oct 2026
2:12 pm
Add Truck 2
Crew 2 — Brad
D46116
Submitted
+19.2 m TF-STD +8 FT-PLAS +8 CLP-STD
+19.2 m 139 m — INV-26-0010
20 Oct 2026
2:10 pm
Install Truck 2
Crew 2 — Brad
D46117
Approved
+120 m TF-STD +50 FT-PLAS +50 CLP-STD
+120 m 120 m — —

Invoices raised on this job

Account customer — invoiced on 14 days
InvoiceWhat forIssuedPeriodStatusEx GST
INV-26-0004 Install 20 Oct 2026 25 Oct – — Draft $580.00
INV-26-0010 Variation 20 Oct 2026 20 Oct – — Draft $242.60
INV-26-0011 Variation 20 Oct 2026 — Draft $185.00
INV-26-0013 Monthly hire 20 Nov 2026 20 Oct – 20 Nov Draft $271.44
INV-26-0014 Monthly hire 20 Nov 2026 20 Oct – 20 Nov Draft $271.44
Billed on this job · $0.00 of it paid $1,550.48

Customer

Big Sky Festivals Pty Ltd
Account 14 days
Contact
Jordan Ellery
Phone
08 9430 1180
ABN
31 655 210 448
Segment
Events & crowd control

Account customer, so this job is invoiced once the install is done and falls due on 14 days.

New Year and long-weekend festivals. Barrier, stage barrier and bins.

Photos and paperwork

nothing filed against this site yet
DocketVisitWhenCrewSigned on site byState
D46116 SV-26-0005 Add 20 Oct 2026 CREW-2 — Submitted
D46117 SV-26-0004 Install 20 Oct 2026 CREW-2 — Approved
D46089 SV-26-0011 Collect 20 Oct 2026 CREW-2 — Submitted

Everything here is held with the job, not in a folder somewhere — so it is still attached to this site in two years when somebody asks what the frontage looked like before the crew started.

Conversation on this job

4 messages — everything said about this, in one place
  1. Out Email Delivery docket D46089 — Test site 1234 20 Oct 2026, 2:19 pm
    All Fence U Rent Pty Ltd → test

    Hi test, We've collected part of the equipment at Test site 1234 today — docket D46089. On this docket: − 19.2 m (8 panels) Temporary Fence — Standard − 8 Fence Shoe — Plastic Filled − 8 Fence Clamp On site now: 50 Fence Clamp 50 Fence Shoe — Plastic Filled 120 m (50 panels) Temporary Fence — Standard You'll get the invoice within 24 to 48 hours. All Fence U Rent Pty Ltd 0408 877 300

  2. Out Email Delivery docket D46116 — Test site 1234 20 Oct 2026, 2:13 pm
    All Fence U Rent Pty Ltd → test

    Hi test, We've delivered the extra equipment at Test site 1234 today — docket D46116. On this docket: + 19.2 m (8 panels) Temporary Fence — Standard + 8 Fence Shoe — Plastic Filled + 8 Fence Clamp On site now: 58 Fence Clamp 58 Fence Shoe — Plastic Filled 139.2 m (58 panels) Temporary Fence — Standard You'll get the invoice within 24 to 48 hours. All Fence U Rent Pty Ltd 0408 877 300

  3. Out Email Delivery docket D46117 — Test site 1234 20 Oct 2026, 2:10 pm
    All Fence U Rent Pty Ltd → test

    Hi test, We've delivered and installed at Test site 1234 today — docket D46117. On this docket: + 120 m (50 panels) Temporary Fence — Standard + 50 Fence Shoe — Plastic Filled + 50 Fence Clamp On site now: 50 Fence Clamp 50 Fence Shoe — Plastic Filled 120 m (50 panels) Temporary Fence — Standard You'll get the invoice within 24 to 48 hours. All Fence U Rent Pty Ltd 0408 877 300

  4. In Website form Accepted — Q-26-0002 20 Oct 2026, 1:59 pm
    test → us

    test accepted quote Q-26-0002 for Test site 1234. Requested install date: 25 Oct 2026