All Fence
All Fence U Rent
J-26-0001 Demo test 1 street · test 1 street
Xero · synced 9:14 am

J-26-0001

On site No account — COD

test 1 street · test 1 street, test 1 street · Pool Fencing · Building & construction

Put out more / take some back

The job

from the accepted quote Q-26-0001 — what's needed on site, and every task to get it there
Needed on site
120 m of pool fence · 52 panels
with 52 shoes, 52 clamps — they go with the panels
Put up so far
152 m
On site now
104 m
Still to go up
—
Beyond the quote
+32 m
Needs sign-off0
—
To assign0
—
With the crew0
—
Done5
Put up 120 m of pool fence (52 panels)
SV-26-0001
✓ Done 14 Oct 2026 · Crew 2 — Brad
In the price — nothing more to invoice
Put out 9 m more pool fence (4 panels)
SV-26-0006
✓ Done 20 Oct 2026 · Crew 2 — Brad
Take back 30 m of pool fence (13 panels)
SV-26-0007
✓ Done 20 Oct 2026 · Crew 2 — Brad
Put out 23 m more pool fence (10 panels)
SV-26-0008
✓ Done 20 Oct 2026 · Crew 2 — Brad
Take back 12 m of pool fence (5 panels)
SV-26-0009
✓ Done 20 Oct 2026 · Crew 2 — Brad
Need more on site, or some back?
How much is on site — right now
104 m of pool fencing fence
48 Fence Clamp 48 Fence Shoe — Plastic Filled 103.9 m Temporary Pool Fence · 45 panels

Added up from 6 completed visits — every delivery, addition, part collection and final collection. Nobody counted anything.

Hire started
14 Oct 2026
Term ends
14 Oct 2027 in 319 days
Billed
12-month term · 12 monthly invoices
Their PO / reference
Not provided
Next visit
none booked
Site contact
Aaron Clayton
› Estimated, loaded and installed — line by line what they asked for, what the truck took, what went in
ItemEstimatedLoadedInstalledAdded CollectedMissingDamagedOn site now
Temporary Pool Fence
TF-POOL · 2.3 m panels
120 m 120 m 120 m +32.2 m −41.4 m 2.3 m 4.6 m 103.9 m
Fence Shoe — Plastic Filled
FT-PLAS
52 52 52 +14 −18 — — 48
Fence Clamp
CLP-STD
52 52 52 +14 −18 — — 48
Fence, metres 120 m 120 m 120 m +32 m −41 m 2 m 5 m 104 m

Installed + added − collected − missing − damaged = on site now, line by line. They asked for 120 m, the truck took 120 m, and 120 m went in — the first invoice bills what went in, not the estimate.

Ins and outs

every delivery, extra delivery, part collection and loss on this site — click one to see what moved
›14 Oct Delivery docket D46120 · Truck 2 +52 panels · 120 m 52panels120 m —
EquipmentInOutLostDamagedOn site after
Temporary Pool Fence +52 panels — — — 52 panels
Fence Shoe — Plastic Filled +52 — — — 52
Fence Clamp +52 — — — 52

Open the docket

›20 Oct Additional delivery docket D46115 · Truck 2 +4 panels · 9 m 56panels129 m INV-26-0005
EquipmentInOutLostDamagedOn site after
Temporary Pool Fence +4 panels — — — 56 panels
Fence Shoe — Plastic Filled +4 — — — 56
Fence Clamp +4 — — — 56

Open the docket · on INV-26-0005 ($185.00 ex GST, waiting for approval)

›20 Oct Part collection docket D46114 · Truck 2 −13 panels · 30 m 43panels99 m INV-26-0006
EquipmentInOutLostDamagedOn site after
Temporary Pool Fence — −13 panels — — 43 panels
Fence Shoe — Plastic Filled — −13 — — 43
Fence Clamp — −13 — — 43

Open the docket · on INV-26-0006 ($185.00 ex GST, waiting for approval)

›20 Oct Additional delivery docket D46113 · Truck 2 +10 panels · 23 m 53panels122 m INV-26-0007
EquipmentInOutLostDamagedOn site after
Temporary Pool Fence +10 panels — — — 53 panels
Fence Shoe — Plastic Filled +10 — — — 53
Fence Clamp +10 — — — 53

Open the docket · on INV-26-0007 ($185.00 ex GST, waiting for approval)

›20 Oct Part collection docket D46112 · Truck 2 −5 panels · 12 m 48panels111 m INV-26-0008
EquipmentInOutLostDamagedOn site after
Temporary Pool Fence — −5 panels — — 48 panels
Fence Shoe — Plastic Filled — −5 — — 48
Fence Clamp — −5 — — 48

Open the docket · on INV-26-0008 ($185.00 ex GST, waiting for approval)

›20 Oct Lost or damaged on site docket D46090 1 panel · 2 m 2 panels · 5 m 45panels104 m INV-26-0009
EquipmentInOutLostDamagedOn site after
Temporary Pool Fence — — 1 panel 2 panels 45 panels

Open the docket · on INV-26-0009 ($230.00 ex GST, waiting for approval)

Running total — every part on site now 104 m of fence
103.9 m · 45 panels Temporary Pool Fence48 Fence Shoe — Plastic Filled48 Fence Clamp
PartWent outCame backLostDamagedOn site now
Temporary Pool Fence +152.2 m · 66 panels −41.4 m · 18 panels −2.3 m · 1 panel −4.6 m · 2 panels 103.9 m · 45 panels
Fence Shoe — Plastic Filled +66 −18 — — 48
Fence Clamp +66 −18 — — 48
Fence, in metres +152 m−41 m−2 m−5 m 104 m

Went out − came back − lost − damaged = on site now, for every part. Added up from every completed visit; nobody counts.

12-month term · 12 monthly invoices. The next hire invoice is drafted — INV-26-0012 is waiting for approval.
Check INV-26-0012

Recurring invoices

12 monthly instalments — what each one was, or will be. Top-ups and pickups change them from the next invoice, once finance confirms.
No.DueInvoiceMonthly priceTop-ups & pickupsChangesTotal ex GST
1 19 Oct 2026 INV-26-0001 Paid $300.00 — — $300.00
2 14 Nov 2026 INV-26-0012 Draft $300.00 — — $300.00
3 14 Dec 2026 to come — drafted on the day $300.00 — — $300.00
4 14 Jan 2027 to come — drafted on the day $300.00 — — $300.00
5 14 Feb 2027 to come — drafted on the day $300.00 — — $300.00
6 14 Mar 2027 to come — drafted on the day $300.00 — — $300.00
7 14 Apr 2027 to come — drafted on the day $300.00 — — $300.00
8 14 May 2027 to come — drafted on the day $300.00 — — $300.00
9 14 June 2027 to come — drafted on the day $300.00 — — $300.00
10 14 July 2027 to come — drafted on the day $300.00 — — $300.00
11 14 Aug 2027 to come — drafted on the day $300.00 — — $300.00
12 14 Sept 2027 to come — drafted on the day $300.00 — — $300.00
The term, as it stands $3,600.00
Changes made
  • Top-up Invoices 2–12: 20 Oct: Temporary Pool Fence, 9.2 m · 4 panels — the same rate as the 120 m at $300.00 a month +$23.00 a month ($300.00 → $323.00) Waiting for finance to confirm →
  • Collected Invoices 2–12: 20 Oct: Temporary Pool Fence, 29.9 m · 13 panels — the same rate as the 120 m at $300.00 a month — collected −$74.75 a month ($323.00 → $248.25) Waiting for finance to confirm →
  • Top-up Invoices 2–12: 20 Oct: Temporary Pool Fence, 23 m · 10 panels — the same rate as the 120 m at $300.00 a month +$57.50 a month ($248.25 → $305.75) Waiting for finance to confirm →
  • Collected Invoices 2–12: 20 Oct: Temporary Pool Fence, 11.5 m · 5 panels — the same rate as the 120 m at $300.00 a month — collected −$28.75 a month ($305.75 → $277.00) Waiting for finance to confirm →

How it got there

metres on site after each visit

The hire

Booked
14 Oct 2026
Billed
12-month term · 12 monthly invoices
Shoes per brace
3
Invoiced on this job
$1,570.00
Booked by
KD
From quote
Q-26-0001

Every visit

including inspections, repairs and what is booked — with photos, dockets and crews Put out more / take some back
DateVisitTruck · crewDocketWhat movedNet metresOn site afterPhotosInvoice
20 Oct 2026
2:11 pm
Loss No truck
—
D46090
Approved
−2.3 m TF-POOL missing −4.6 m TF-POOL damaged
−6.9 m 104 m — INV-26-0009
20 Oct 2026
2:11 pm
Collect Truck 2
Crew 2 — Brad
D46112
Submitted
−11.5 m TF-POOL −5 FT-PLAS −5 CLP-STD
−11.5 m 111 m — INV-26-0008
20 Oct 2026
2:10 pm
Add Truck 2
Crew 2 — Brad
D46113
Submitted
+23 m TF-POOL +10 FT-PLAS +10 CLP-STD
+23 m 122 m — INV-26-0007
20 Oct 2026
2:10 pm
Collect Truck 2
Crew 2 — Brad
D46114
Submitted
−29.9 m TF-POOL −13 FT-PLAS −13 CLP-STD
−29.9 m 99 m — INV-26-0006
20 Oct 2026
2:10 pm
Add Truck 2
Crew 2 — Brad
D46115
Submitted
+9.2 m TF-POOL +4 FT-PLAS +4 CLP-STD
+9.2 m 129 m — INV-26-0005
14 Oct 2026
7:35 pm
Install Truck 2
Crew 2 — Brad
D46120
Approved
+120 m TF-POOL +52 FT-PLAS +52 CLP-STD
+120 m 120 m — —

Invoices raised on this job

No account — payment before dispatch
InvoiceWhat forIssuedPeriodStatusEx GST
INV-26-0001 Term instalment 14 Oct 2026 19 Oct – 19 Nov Paid $300.00
INV-26-0005 Variation 20 Oct 2026 20 Oct – — Draft $185.00
INV-26-0006 Variation 20 Oct 2026 — Draft $185.00
INV-26-0007 Variation 20 Oct 2026 20 Oct – — Draft $185.00
INV-26-0008 Variation 20 Oct 2026 — Draft $185.00
INV-26-0009 Damage & loss 20 Oct 2026 — Draft $230.00
INV-26-0012 Term instalment 14 Nov 2026 14 Nov – 14 Dec Draft $300.00
Billed on this job · $300.00 of it paid $1,570.00

Customer

Praxa Tech
No account COD
Contact
Aaron Clayton
Phone
ABN
—
Segment
Building & construction

No account, so the job holds on Booked until payment clears — the truck is not loaded before that.

Came in through the website (E-26-0001). No account — invoice at booking, pay before dispatch.

Notes

No account — payment required before the truck is loaded

Photos and paperwork

nothing filed against this site yet
DocketVisitWhenCrewSigned on site byState
D46120 SV-26-0001 Install 14 Oct 2026 CREW-2 — Approved
D46115 SV-26-0006 Add 20 Oct 2026 CREW-2 — Submitted
D46114 SV-26-0007 Collect 20 Oct 2026 CREW-2 — Submitted
D46113 SV-26-0008 Add 20 Oct 2026 CREW-2 — Submitted
D46112 SV-26-0009 Collect 20 Oct 2026 CREW-2 — Submitted
D46090 SV-26-0010 Loss 20 Oct 2026 — — Approved

Everything here is held with the job, not in a folder somewhere — so it is still attached to this site in two years when somebody asks what the frontage looked like before the crew started.

Conversation on this job

8 messages — everything said about this, in one place
  1. Out Email Delivery docket D46112 — test 1 street 20 Oct 2026, 2:11 pm
    All Fence U Rent Pty Ltd → Aaron Clayton

    Hi Aaron, We've collected part of the equipment at test 1 street today — docket D46112. On this docket: − 11.5 m (5 panels) Temporary Pool Fence − 5 Fence Shoe — Plastic Filled − 5 Fence Clamp On site now: 48 Fence Clamp 48 Fence Shoe — Plastic Filled 110.8 m (48 panels) Temporary Pool Fence You'll get the invoice within 24 to 48 hours. All Fence U Rent Pty Ltd 0408 877 300

  2. Out Email Delivery docket D46113 — test 1 street 20 Oct 2026, 2:10 pm
    All Fence U Rent Pty Ltd → Aaron Clayton

    Hi Aaron, We've delivered the extra equipment at test 1 street today — docket D46113. On this docket: + 23 m (10 panels) Temporary Pool Fence + 10 Fence Shoe — Plastic Filled + 10 Fence Clamp On site now: 53 Fence Clamp 53 Fence Shoe — Plastic Filled 122.3 m (53 panels) Temporary Pool Fence You'll get the invoice within 24 to 48 hours. All Fence U Rent Pty Ltd 0408 877 300

  3. Out Email Delivery docket D46114 — test 1 street 20 Oct 2026, 2:10 pm
    All Fence U Rent Pty Ltd → Aaron Clayton

    Hi Aaron, We've collected part of the equipment at test 1 street today — docket D46114. On this docket: − 29.9 m (13 panels) Temporary Pool Fence − 13 Fence Shoe — Plastic Filled − 13 Fence Clamp On site now: 43 Fence Clamp 43 Fence Shoe — Plastic Filled 99.3 m (43 panels) Temporary Pool Fence You'll get the invoice within 24 to 48 hours. All Fence U Rent Pty Ltd 0408 877 300

  4. Out Email Delivery docket D46115 — test 1 street 20 Oct 2026, 2:10 pm
    All Fence U Rent Pty Ltd → Aaron Clayton

    Hi Aaron, We've delivered the extra equipment at test 1 street today — docket D46115. On this docket: + 9.2 m (4 panels) Temporary Pool Fence + 4 Fence Shoe — Plastic Filled + 4 Fence Clamp On site now: 56 Fence Clamp 56 Fence Shoe — Plastic Filled 129.2 m (56 panels) Temporary Pool Fence You'll get the invoice within 24 to 48 hours. All Fence U Rent Pty Ltd 0408 877 300

  5. Out Email Delivery docket D46120 — test 1 street 14 Oct 2026, 7:35 pm
    All Fence U Rent Pty Ltd → Aaron Clayton

    Hi Aaron, We've delivered and installed at test 1 street today — docket D46120. On this docket: + 120 m (52 panels) Temporary Pool Fence + 52 Fence Shoe — Plastic Filled + 52 Fence Clamp On site now: 52 Fence Clamp 52 Fence Shoe — Plastic Filled 120 m (52 panels) Temporary Pool Fence You'll get the invoice within 24 to 48 hours. All Fence U Rent Pty Ltd 0408 877 300

  6. In Website form Accepted — Q-26-0001 14 Oct 2026, 7:32 pm
    Aaron Clayton → us

    Aaron Clayton accepted quote Q-26-0001 for test 1 street. Requested install date: 19 Oct 2026

  7. Out Email Quote Q-26-0001 — test 1 street 14 Oct 2026, 7:32 pm
    Keshia Dorrington, All Fence U Rent Pty Ltd → Aaron Clayton

    Hi Aaron, Thanks for the enquiry. Quote Q-26-0001 is attached for test 1 street, test 1 street — pool fencing, 12-month term · 12 monthly invoices, $300.00 ex GST with the first instalment. Delivery, install and the final collection are included. The term is locked; anything added during it is pro-rated to the end of the term. You can accept it here: /q/q2600018whz0y When you accept, it will ask you what date you would like it installed. Keshia Dorrington Rental Manager · All Fence U Rent Pty Ltd 0408 877 300

  8. In Phone Phone enquiry — test 1 street 14 Oct 2026, 7:31 pm
    Aaron Clayton → us

    need new fencing Site: test 1 street How much: 120 m of pool fencing How long: 12 month(s) Email: aaron@praxatech.com

Anything outbound also lands in Sent Items.