J-26-0001
On site No account — CODtest 1 street · test 1 street, test 1 street · Pool Fencing · Building & construction
The job
from the accepted quote Q-26-0001 — what's needed on site, and every task to get it thereAdded up from 6 completed visits — every delivery, addition, part collection and final collection. Nobody counted anything.
- Hire started
- 14 Oct 2026
- Term ends
- 14 Oct 2027 in 319 days
- Billed
- 12-month term · 12 monthly invoices
- Their PO / reference
- Not provided
- Next visit
- none booked
- Site contact
- Aaron Clayton
› Estimated, loaded and installed — line by line what they asked for, what the truck took, what went in
| Item | Estimated | Loaded | Installed | Added | Collected | Missing | Damaged | On site now |
|---|---|---|---|---|---|---|---|---|
| Temporary Pool Fence TF-POOL · 2.3 m panels | 120 m | 120 m | 120 m | +32.2 m | −41.4 m | 2.3 m | 4.6 m | 103.9 m |
| Fence Shoe — Plastic Filled FT-PLAS | 52 | 52 | 52 | +14 | −18 | — | — | 48 |
| Fence Clamp CLP-STD | 52 | 52 | 52 | +14 | −18 | — | — | 48 |
| Fence, metres | 120 m | 120 m | 120 m | +32 m | −41 m | 2 m | 5 m | 104 m |
Installed + added − collected − missing − damaged = on site now, line by line. They asked for 120 m, the truck took 120 m, and 120 m went in — the first invoice bills what went in, not the estimate.
Ins and outs
every delivery, extra delivery, part collection and loss on this site — click one to see what moved›14 Oct Delivery docket D46120 · Truck 2 +52 panels · 120 m 52panels120 m —
| Equipment | In | Out | Lost | Damaged | On site after |
|---|---|---|---|---|---|
| Temporary Pool Fence | +52 panels | — | — | — | 52 panels |
| Fence Shoe — Plastic Filled | +52 | — | — | — | 52 |
| Fence Clamp | +52 | — | — | — | 52 |
›20 Oct Additional delivery docket D46115 · Truck 2 +4 panels · 9 m 56panels129 m INV-26-0005
| Equipment | In | Out | Lost | Damaged | On site after |
|---|---|---|---|---|---|
| Temporary Pool Fence | +4 panels | — | — | — | 56 panels |
| Fence Shoe — Plastic Filled | +4 | — | — | — | 56 |
| Fence Clamp | +4 | — | — | — | 56 |
Open the docket · on INV-26-0005 ($185.00 ex GST, waiting for approval)
›20 Oct Part collection docket D46114 · Truck 2 −13 panels · 30 m 43panels99 m INV-26-0006
| Equipment | In | Out | Lost | Damaged | On site after |
|---|---|---|---|---|---|
| Temporary Pool Fence | — | −13 panels | — | — | 43 panels |
| Fence Shoe — Plastic Filled | — | −13 | — | — | 43 |
| Fence Clamp | — | −13 | — | — | 43 |
Open the docket · on INV-26-0006 ($185.00 ex GST, waiting for approval)
›20 Oct Additional delivery docket D46113 · Truck 2 +10 panels · 23 m 53panels122 m INV-26-0007
| Equipment | In | Out | Lost | Damaged | On site after |
|---|---|---|---|---|---|
| Temporary Pool Fence | +10 panels | — | — | — | 53 panels |
| Fence Shoe — Plastic Filled | +10 | — | — | — | 53 |
| Fence Clamp | +10 | — | — | — | 53 |
Open the docket · on INV-26-0007 ($185.00 ex GST, waiting for approval)
›20 Oct Part collection docket D46112 · Truck 2 −5 panels · 12 m 48panels111 m INV-26-0008
| Equipment | In | Out | Lost | Damaged | On site after |
|---|---|---|---|---|---|
| Temporary Pool Fence | — | −5 panels | — | — | 48 panels |
| Fence Shoe — Plastic Filled | — | −5 | — | — | 48 |
| Fence Clamp | — | −5 | — | — | 48 |
Open the docket · on INV-26-0008 ($185.00 ex GST, waiting for approval)
›20 Oct Lost or damaged on site docket D46090 1 panel · 2 m 2 panels · 5 m 45panels104 m INV-26-0009
| Equipment | In | Out | Lost | Damaged | On site after |
|---|---|---|---|---|---|
| Temporary Pool Fence | — | — | 1 panel | 2 panels | 45 panels |
Open the docket · on INV-26-0009 ($230.00 ex GST, waiting for approval)
| Part | Went out | Came back | Lost | Damaged | On site now |
|---|---|---|---|---|---|
| Temporary Pool Fence | +152.2 m · 66 panels | −41.4 m · 18 panels | −2.3 m · 1 panel | −4.6 m · 2 panels | 103.9 m · 45 panels |
| Fence Shoe — Plastic Filled | +66 | −18 | — | — | 48 |
| Fence Clamp | +66 | −18 | — | — | 48 |
| Fence, in metres | +152 m | −41 m | −2 m | −5 m | 104 m |
Went out − came back − lost − damaged = on site now, for every part. Added up from every completed visit; nobody counts.
Recurring invoices
12 monthly instalments — what each one was, or will be. Top-ups and pickups change them from the next invoice, once finance confirms.| No. | Due | Invoice | Monthly price | Top-ups & pickups | Changes | Total ex GST |
|---|---|---|---|---|---|---|
| 1 | 19 Oct 2026 | INV-26-0001 Paid | $300.00 | — | — | $300.00 |
| 2 | 14 Nov 2026 | INV-26-0012 Draft | $300.00 | — | — | $300.00 |
| 3 | 14 Dec 2026 | to come — drafted on the day | $300.00 | — | — | $300.00 |
| 4 | 14 Jan 2027 | to come — drafted on the day | $300.00 | — | — | $300.00 |
| 5 | 14 Feb 2027 | to come — drafted on the day | $300.00 | — | — | $300.00 |
| 6 | 14 Mar 2027 | to come — drafted on the day | $300.00 | — | — | $300.00 |
| 7 | 14 Apr 2027 | to come — drafted on the day | $300.00 | — | — | $300.00 |
| 8 | 14 May 2027 | to come — drafted on the day | $300.00 | — | — | $300.00 |
| 9 | 14 June 2027 | to come — drafted on the day | $300.00 | — | — | $300.00 |
| 10 | 14 July 2027 | to come — drafted on the day | $300.00 | — | — | $300.00 |
| 11 | 14 Aug 2027 | to come — drafted on the day | $300.00 | — | — | $300.00 |
| 12 | 14 Sept 2027 | to come — drafted on the day | $300.00 | — | — | $300.00 |
| The term, as it stands | $3,600.00 | |||||
- Top-up Invoices 2–12: 20 Oct: Temporary Pool Fence, 9.2 m · 4 panels — the same rate as the 120 m at $300.00 a month +$23.00 a month ($300.00 → $323.00) Waiting for finance to confirm →
- Collected Invoices 2–12: 20 Oct: Temporary Pool Fence, 29.9 m · 13 panels — the same rate as the 120 m at $300.00 a month — collected −$74.75 a month ($323.00 → $248.25) Waiting for finance to confirm →
- Top-up Invoices 2–12: 20 Oct: Temporary Pool Fence, 23 m · 10 panels — the same rate as the 120 m at $300.00 a month +$57.50 a month ($248.25 → $305.75) Waiting for finance to confirm →
- Collected Invoices 2–12: 20 Oct: Temporary Pool Fence, 11.5 m · 5 panels — the same rate as the 120 m at $300.00 a month — collected −$28.75 a month ($305.75 → $277.00) Waiting for finance to confirm →
How it got there
metres on site after each visitThe hire
- Booked
- 14 Oct 2026
- Billed
- 12-month term · 12 monthly invoices
- Shoes per brace
- 3
- Invoiced on this job
- $1,570.00
- Booked by
- KD
- From quote
- Q-26-0001
Every visit
including inspections, repairs and what is booked — with photos, dockets and crews Put out more / take some back
| Date | Visit | Truck · crew | Docket | What moved | Net metres | On site after | Photos | Invoice |
|---|---|---|---|---|---|---|---|---|
| 20 Oct 2026 2:11 pm | Loss | No truck — | D46090 Approved | −2.3 m TF-POOL missing −4.6 m TF-POOL damaged | −6.9 m | 104 m | — | INV-26-0009 |
| 20 Oct 2026 2:11 pm | Collect | Truck 2 Crew 2 — Brad | D46112 Submitted | −11.5 m TF-POOL −5 FT-PLAS −5 CLP-STD | −11.5 m | 111 m | — | INV-26-0008 |
| 20 Oct 2026 2:10 pm | Add | Truck 2 Crew 2 — Brad | D46113 Submitted | +23 m TF-POOL +10 FT-PLAS +10 CLP-STD | +23 m | 122 m | — | INV-26-0007 |
| 20 Oct 2026 2:10 pm | Collect | Truck 2 Crew 2 — Brad | D46114 Submitted | −29.9 m TF-POOL −13 FT-PLAS −13 CLP-STD | −29.9 m | 99 m | — | INV-26-0006 |
| 20 Oct 2026 2:10 pm | Add | Truck 2 Crew 2 — Brad | D46115 Submitted | +9.2 m TF-POOL +4 FT-PLAS +4 CLP-STD | +9.2 m | 129 m | — | INV-26-0005 |
| 14 Oct 2026 7:35 pm | Install | Truck 2 Crew 2 — Brad | D46120 Approved | +120 m TF-POOL +52 FT-PLAS +52 CLP-STD | +120 m | 120 m | — | — |
Invoices raised on this job
No account — payment before dispatch| Invoice | What for | Issued | Period | Status | Ex GST |
|---|---|---|---|---|---|
| INV-26-0001 | Term instalment | 14 Oct 2026 | 19 Oct – 19 Nov | Paid | $300.00 |
| INV-26-0005 | Variation | 20 Oct 2026 | 20 Oct – — | Draft | $185.00 |
| INV-26-0006 | Variation | 20 Oct 2026 | — | Draft | $185.00 |
| INV-26-0007 | Variation | 20 Oct 2026 | 20 Oct – — | Draft | $185.00 |
| INV-26-0008 | Variation | 20 Oct 2026 | — | Draft | $185.00 |
| INV-26-0009 | Damage & loss | 20 Oct 2026 | — | Draft | $230.00 |
| INV-26-0012 | Term instalment | 14 Nov 2026 | 14 Nov – 14 Dec | Draft | $300.00 |
| Billed on this job · $300.00 of it paid | $1,570.00 | ||||
Customer
- Contact
- Aaron Clayton
- Phone
- ABN
- —
- Segment
- Building & construction
No account, so the job holds on Booked until payment clears — the truck is not loaded before that.
Came in through the website (E-26-0001). No account — invoice at booking, pay before dispatch.
No account — payment required before the truck is loaded
Photos and paperwork
nothing filed against this site yet| Docket | Visit | When | Crew | Signed on site by | State | |
|---|---|---|---|---|---|---|
| D46120 | SV-26-0001 Install | 14 Oct 2026 | CREW-2 | — | Approved | |
| D46115 | SV-26-0006 Add | 20 Oct 2026 | CREW-2 | — | Submitted | |
| D46114 | SV-26-0007 Collect | 20 Oct 2026 | CREW-2 | — | Submitted | |
| D46113 | SV-26-0008 Add | 20 Oct 2026 | CREW-2 | — | Submitted | |
| D46112 | SV-26-0009 Collect | 20 Oct 2026 | CREW-2 | — | Submitted | |
| D46090 | SV-26-0010 Loss | 20 Oct 2026 | — | — | Approved |
Everything here is held with the job, not in a folder somewhere — so it is still attached to this site in two years when somebody asks what the frontage looked like before the crew started.
Conversation on this job
8 messages — everything said about this, in one place- Out Email Delivery docket D46112 — test 1 street 20 Oct 2026, 2:11 pmAll Fence U Rent Pty Ltd → Aaron Clayton
Hi Aaron, We've collected part of the equipment at test 1 street today — docket D46112. On this docket: − 11.5 m (5 panels) Temporary Pool Fence − 5 Fence Shoe — Plastic Filled − 5 Fence Clamp On site now: 48 Fence Clamp 48 Fence Shoe — Plastic Filled 110.8 m (48 panels) Temporary Pool Fence You'll get the invoice within 24 to 48 hours. All Fence U Rent Pty Ltd 0408 877 300
- Out Email Delivery docket D46113 — test 1 street 20 Oct 2026, 2:10 pmAll Fence U Rent Pty Ltd → Aaron Clayton
Hi Aaron, We've delivered the extra equipment at test 1 street today — docket D46113. On this docket: + 23 m (10 panels) Temporary Pool Fence + 10 Fence Shoe — Plastic Filled + 10 Fence Clamp On site now: 53 Fence Clamp 53 Fence Shoe — Plastic Filled 122.3 m (53 panels) Temporary Pool Fence You'll get the invoice within 24 to 48 hours. All Fence U Rent Pty Ltd 0408 877 300
- Out Email Delivery docket D46114 — test 1 street 20 Oct 2026, 2:10 pmAll Fence U Rent Pty Ltd → Aaron Clayton
Hi Aaron, We've collected part of the equipment at test 1 street today — docket D46114. On this docket: − 29.9 m (13 panels) Temporary Pool Fence − 13 Fence Shoe — Plastic Filled − 13 Fence Clamp On site now: 43 Fence Clamp 43 Fence Shoe — Plastic Filled 99.3 m (43 panels) Temporary Pool Fence You'll get the invoice within 24 to 48 hours. All Fence U Rent Pty Ltd 0408 877 300
- Out Email Delivery docket D46115 — test 1 street 20 Oct 2026, 2:10 pmAll Fence U Rent Pty Ltd → Aaron Clayton
Hi Aaron, We've delivered the extra equipment at test 1 street today — docket D46115. On this docket: + 9.2 m (4 panels) Temporary Pool Fence + 4 Fence Shoe — Plastic Filled + 4 Fence Clamp On site now: 56 Fence Clamp 56 Fence Shoe — Plastic Filled 129.2 m (56 panels) Temporary Pool Fence You'll get the invoice within 24 to 48 hours. All Fence U Rent Pty Ltd 0408 877 300
- Out Email Delivery docket D46120 — test 1 street 14 Oct 2026, 7:35 pmAll Fence U Rent Pty Ltd → Aaron Clayton
Hi Aaron, We've delivered and installed at test 1 street today — docket D46120. On this docket: + 120 m (52 panels) Temporary Pool Fence + 52 Fence Shoe — Plastic Filled + 52 Fence Clamp On site now: 52 Fence Clamp 52 Fence Shoe — Plastic Filled 120 m (52 panels) Temporary Pool Fence You'll get the invoice within 24 to 48 hours. All Fence U Rent Pty Ltd 0408 877 300
- In Website form Accepted — Q-26-0001 14 Oct 2026, 7:32 pmAaron Clayton → us
Aaron Clayton accepted quote Q-26-0001 for test 1 street. Requested install date: 19 Oct 2026
- Out Email Quote Q-26-0001 — test 1 street 14 Oct 2026, 7:32 pmKeshia Dorrington, All Fence U Rent Pty Ltd → Aaron Clayton
Hi Aaron, Thanks for the enquiry. Quote Q-26-0001 is attached for test 1 street, test 1 street — pool fencing, 12-month term · 12 monthly invoices, $300.00 ex GST with the first instalment. Delivery, install and the final collection are included. The term is locked; anything added during it is pro-rated to the end of the term. You can accept it here: /q/q2600018whz0y When you accept, it will ask you what date you would like it installed. Keshia Dorrington Rental Manager · All Fence U Rent Pty Ltd 0408 877 300
- In Phone Phone enquiry — test 1 street 14 Oct 2026, 7:31 pmAaron Clayton → us
need new fencing Site: test 1 street How much: 120 m of pool fencing How long: 12 month(s) Email: aaron@praxatech.com