All Fence
All Fence U Rent
To approve Demo 8 waiting
Xero · synced 9:14 am 14 Aug 2026

To approve

Everything the system has worked out and left for someone to look at. Continuation invoices are priced off what is standing on each site today, job requests carry the date the customer asked for, and a docket does not move a single panel in the yard until it is checked off here.

Waiting on you
8
across the three queues
Continuation to send
$5,470
3 invoices, none sent yet
Jobs to approve
2
quotes the customer has accepted
Dockets in from site
3
nothing posted to the yard yet

Continuation of hire — worked out, not sent

each one priced on the equipment standing on that site today, at the per-block rate on the job $5,470.40
INV-26-1078 Waiting on you Tonkin Gap — Guildford Rd Interchange
Georgiou Group Pty Ltd · J-26-0119 · block 2 of continuation · 03 Aug 2026 – 31 Aug 2026 · hire ended 06 July 2026 (39 days ago)
$2,972.20
$3,269.42 inc GST · terms 30 days EOM
What is on siteInstalledOn site nowQty billedRateAmount
TF-BRC Temporary Fence — Standard Braced 580.8 m 612 m +31 612 m $2.35/m/block $1,438.20
SC-BLOK Total Block Out Screening 578 m 796 m +218 796 m $1.75/m/block $1,393.00
SIGN-SITE Site Safety Sign 10 10 10 $4.50/unit/block $45.00
GT-VEH Vehicle Gate — 6m Double Swing 2 2 2 $48.00/unit/block $96.00

This site had 1,159 m installed and has 1,408 m on it now, so it is billed on 1,408 m — extra runs went in.

Open it
INV-26-1077 Waiting on you Stirling Highway Duplication — Stage 2
Georgiou Group Pty Ltd · J-26-0118 · block 1 of continuation · 03 Aug 2026 – 31 Aug 2026 · hire ended 03 Aug 2026 (11 days ago)
$1,834.24
$2,017.66 inc GST · terms 30 days EOM
What is on siteInstalledOn site nowQty billedRateAmount
TF-BRC Temporary Fence — Standard Braced 607.2 m 518.4 m −89 518.4 m $2.35/m/block $1,218.24
SC-BLOK Total Block Out Screening 434 m 274 m −160 274 m $1.75/m/block $479.50
SIGN-SITE Site Safety Sign 9 9 9 $4.50/unit/block $40.50
GT-VEH Vehicle Gate — 6m Double Swing 2 2 2 $48.00/unit/block $96.00

This site had 1,041 m installed and has 792 m on it now, so it is billed on 792 m — some has already come back.

Open it
INV-26-1079 Waiting on you Joondalup Health Campus Car Park
PACT Construction Pty Ltd · J-26-0128 · block 2 of continuation · 03 Aug 2026 – 31 Aug 2026 · hire ended 06 July 2026 (39 days ago)
$663.96
$730.36 inc GST · terms 30 days EOM
What is on siteInstalledOn site nowQty billedRateAmount
TF-BRC Temporary Fence — Standard Braced 225.6 m 213.6 m −12 213.6 m $2.35/m/block $501.96
SIGN-SITE Site Safety Sign 5 5 5 $4.50/unit/block $22.50
GT-PED Pedestrian Gate Panel 3 3 3 $14.50/unit/block $43.50
GT-VEH Vehicle Gate — 6m Double Swing 2 2 2 $48.00/unit/block $96.00

This site had 226 m installed and has 214 m on it now, so it is billed on 214 m — some has already come back.

Open it

Jobs the customer has accepted

they have said yes to the price and named a date — nothing is on the run sheet yet
J-26-0154 Awaiting approval Wandi — Lot 812 Kingsbridge Blvd
Dale Alcock Homes Pty Ltd · Wandi · Standard · 50 m asked for · 3 blocks · 12 weeks
They asked for
18 Aug 2026 — in 4 days

“Slab is booked for the Monday, need the frontage up before the truck gets there.”

$702
ex GST, on what they asked for
Approving it books the install on the run sheet and starts the hire period from that day.
Open the job
J-26-0155 Awaiting approval Cannington — Albany Hwy childcare
PACT Construction Pty Ltd · Cannington · Standard Braced · 247 m asked for · 6 blocks · 24 weeks
They asked for
24 Aug 2026 — in 10 days

“Can you do the whole perimeter including the laneway side?”

$5,326
ex GST, on what they asked for
Approving it books the install on the run sheet and starts the hire period from that day.
Open the job

Dockets in from site

the crews have sent these in — checking one off posts the movements, updates the running total and moves the yard
SV-26-0468 Add Submitted Newman Health Campus Upgrade docket D41881
Doric Group Pty Ltd · Crew 2 — Brad · in at 14 Aug 2026, 4:19 pm · sent 14 Aug 2026, 8:54 pm · signed on site by Danny Fitzhardinge · photos

“Extra run in on the eastern boundary as asked.”

417 m
3 lines on the docket
ItemQuantityConditionNote
TF-BRC Temporary Fence — Standard Braced +160.8 m Good
SC-BLOK Total Block Out Screening +256 m Good
BRC-KIT Bracing Kit +22 Good
Labour
On site
1.5 hrs × 2 = 3 hrs
Allowed in the price
4.02 hrs
Chargeable
0 hrs

Inside the allowance. Nothing extra to charge.

Nothing has moved in the yard yet.
Open the docket
SV-26-0469 Collect Submitted Bentley Technology Park — Building C docket D41882
Jaxon Construction Pty Ltd · Crew 3 — Jai · in at 14 Aug 2026, 4:40 pm · sent 14 Aug 2026, 8:27 pm · signed on site by Priya Nandakumar · photos

“Took back the northern face. Rest stays.”

84 m
1 line on the docket
ItemQuantityConditionNote
TF-BRC Temporary Fence — Standard Braced −84 m Good
Labour
On site
0.75 hrs × 2 = 1.5 hrs
Allowed in the price
2.1 hrs
Chargeable
0 hrs

Inside the allowance. Nothing extra to charge.

Nothing has moved in the yard yet.
Open the docket
SV-26-0467 Add Submitted Hasler Road Commercial — Lot 447 docket D41880
BGC Construction Pty Ltd · Crew 1 — Ricky · in at 14 Aug 2026, 2:29 pm · sent 14 Aug 2026, 6:00 pm · signed on site by Marcus Devereux · photos

“Held up an hour and a half at the gate waiting on the PM to induct us before we could start.”

122 m
2 lines on the docket
ItemQuantityConditionNote
TF-BRC Temporary Fence — Standard Braced +122.4 m Good
BRC-KIT Bracing Kit +10 Good
Labour
On site
2 hrs × 3 = 6 hrs
Allowed in the price
3.06 hrs
Chargeable
3 hrs · $285.00

Waiting on the project manager — the allowance was already inside the install price, so only the 3 hrs over it goes on the invoice.

Nothing has moved in the yard yet.
Open the docket