Continuation of hire Demo 12 jobs · $21,970 ex GST
Xero · synced 9:14 am 27 Sept 2026

Continuation of hire

Once a job runs past the period it was hired for — and past the courtesy days — hire continues in four-week blocks, charged on the equipment standing on that site today rather than on the quantity that was originally quoted. Every figure below is worked from the running total, so a site that has had two extra runs put in is charged for two extra runs. Nothing here is sent: working these out puts them in the approval queue for somebody to look over first.

Owing, not yet proposed
$21,970
across 12 jobs
Running at
$14,257
per four-week block on today\'s quantities
Quantity has changed
7
of 12 differ from what was installed
Raised this way to date
$19,805
8 continuation invoices
tick the ones to bill — the invoice is written off the lines shown underneath $21,969.81
J-26-0129 Bunbury Foreshore Redevelopment On site
Perkins Builders Pty Ltd · Bunbury · agreed 2 blocks · 8 weeks, off hire was due 17 July 2026 (72 days ago), courtesy days ran out 22 July 2026
$4,503.78
$2,251.89 × 2 blocks · 8 weeks
14 Aug 2026 – 09 Oct 2026
ItemInstalledOn site nowRatePer block× 2
GT-VEH Vehicle Gate — 6m Double Swing 2 2 $48.00/unit/block $96.00 $192.00
SC-BLOK Total Block Out Screening 368 m 483 m +115 $1.75/m/block $845.25 $1,690.50
SIGN-SITE Site Safety Sign 8 8 $4.50/unit/block $36.00 $72.00
TF-BRC Temporary Fence — Standard Braced 448.8 m 542.4 m +94 $2.35/m/block $1,274.64 $2,549.28

This site had 817 m installed and now has 1,025 m on it — extra runs went in during the hire, so continuation is charged on 1,025 m.

J-26-0126 Newman Health Campus Upgrade On site
Doric Group Pty Ltd · Newman · agreed 1 block · 4 weeks, off hire was due 07 Sept 2026 (20 days ago), courtesy days ran out 12 Sept 2026
$3,885.91
$3,885.91 × 1 block · 4 weeks
07 Sept 2026 – 05 Oct 2026
ItemInstalledOn site nowRatePer block× 1
BIN-3 Containment Bin — 3m³ 4 4 $95.00/unit/block $380.00 $380.00
BW-COIL Barbed Wire Coil — 100m 10 10 $32.00/unit/block $320.00 $320.00
SC-BLOK Total Block Out Screening 837 m 837 m $1.75/m/block $1,464.75 $1,464.75
SIGN-SITE Site Safety Sign 14 14 $4.50/unit/block $63.00 $63.00
TF-BRC Temporary Fence — Standard Braced 705.6 m 705.6 m $2.35/m/block $1,658.16 $1,658.16
J-26-0134 Belmont Apartments — Stage 1 On site
Northerly Group Pty Ltd · Belmont · agreed 3 blocks · 12 weeks, off hire was due 20 July 2026 (69 days ago), courtesy days ran out 25 July 2026
$3,105.18
$1,035.06 × 3 blocks · 12 weeks
20 July 2026 – 12 Oct 2026
ItemInstalledOn site nowRatePer block× 3
GT-PED Pedestrian Gate Panel 3 3 $14.50/unit/block $43.50 $130.50
GT-VEH Vehicle Gate — 6m Double Swing 2 2 $48.00/unit/block $96.00 $288.00
SIGN-SITE Site Safety Sign 6 6 $4.50/unit/block $27.00 $81.00
TF-BRC Temporary Fence — Standard Braced 295.2 m 369.6 m +74 $2.35/m/block $868.56 $2,605.68

This site had 295 m installed and now has 370 m on it — extra runs went in during the hire, so continuation is charged on 370 m.

J-26-0132 Northbridge Mixed Use — 91 James St On site
EMCO Building Pty Ltd · Northbridge · agreed 1 block · 4 weeks, off hire was due 07 Aug 2026 (51 days ago), courtesy days ran out 12 Aug 2026
$2,849.40
$1,424.70 × 2 blocks · 8 weeks
07 Aug 2026 – 02 Oct 2026
ItemInstalledOn site nowRatePer block× 2
CLP-ANTI Anti-Tamper Clamp 179 179 $1.80/unit/block $322.20 $644.40
GT-PED Pedestrian Gate Panel 3 3 $14.50/unit/block $43.50 $87.00
SCAF-NET Scaf Net 252 m 252 m $1.20/m/block $302.40 $604.80
SIGN-SITE Site Safety Sign 6 6 $4.50/unit/block $27.00 $54.00
TF-SCAF Temporary Fence — Braced with Scaf Net 228 m 228 m $3.20/m/block $729.60 $1,459.20
J-26-0137 Ellenbrook Display Village On site
Dale Alcock Homes Pty Ltd · Ellenbrook · agreed 2 blocks · 8 weeks, off hire was due 12 Aug 2026 (46 days ago), courtesy days ran out 17 Aug 2026
$1,816.80
$908.40 × 2 blocks · 8 weeks
12 Aug 2026 – 07 Oct 2026
ItemInstalledOn site nowRatePer block× 2
MNR-STD Manor Fence 66 m 66 m $4.60/m/block $303.60 $607.20
WPF-STD White Picket Fence 144 m 144 m $4.20/m/block $604.80 $1,209.60
J-26-0120 Karel Avenue Bridge Widening On site
Georgiou Group Pty Ltd · Leeming · agreed 3 blocks · 12 weeks, off hire was due 31 Aug 2026 (27 days ago), courtesy days ran out 05 Sept 2026
$1,643.58
$1,643.58 × 1 block · 4 weeks
31 Aug 2026 – 28 Sept 2026
ItemInstalledOn site nowRatePer block× 1
GT-VEH Vehicle Gate — 6m Double Swing 2 2 $48.00/unit/block $96.00 $96.00
SC-BLOK Total Block Out Screening 312 m 312 m $1.75/m/block $546.00 $546.00
SIGN-SITE Site Safety Sign 7 7 $4.50/unit/block $31.50 $31.50
TF-BRC Temporary Fence — Standard Braced 357.6 m 412.8 m +55 $2.35/m/block $970.08 $970.08

This site had 670 m installed and now has 725 m on it — extra runs went in during the hire, so continuation is charged on 725 m.

J-26-0138 Wellard Green — Release 12 Off hire requested
Summit Homes Group · Wellard · agreed 2 blocks · 8 weeks, off hire was due 27 July 2026 (62 days ago), courtesy days ran out 01 Aug 2026
$916.44
$305.48 × 3 blocks · 12 weeks
27 July 2026 – 19 Oct 2026
ItemInstalledOn site nowRatePer block× 3
GT-PED Pedestrian Gate Panel 2 2 $14.50/unit/block $29.00 $87.00
TF-STD Temporary Fence — Standard 112.8 m 153.6 m +41 $1.80/m/block $276.48 $829.44

This site had 113 m installed and now has 154 m on it — extra runs went in during the hire, so continuation is charged on 154 m.

J-26-0130 Innaloo Primary School — New Block On site
Firm Construction Pty Ltd · Innaloo · agreed 3 blocks · 12 weeks, off hire was due 09 Sept 2026 (18 days ago), courtesy days ran out 14 Sept 2026
$895.20
$895.20 × 1 block · 4 weeks
09 Sept 2026 – 07 Oct 2026
ItemInstalledOn site nowRatePer block× 1
GT-PED Pedestrian Gate Panel 3 3 $14.50/unit/block $43.50 $43.50
GT-VEH Vehicle Gate — 6m Double Swing 2 2 $48.00/unit/block $96.00 $96.00
SIGN-SITE Site Safety Sign 5 5 $4.50/unit/block $22.50 $22.50
TF-BRC Temporary Fence — Standard Braced 297.6 m 312 m +14 $2.35/m/block $733.20 $733.20

This site had 298 m installed and now has 312 m on it — extra runs went in during the hire, so continuation is charged on 312 m.

J-26-0131 Bentley Technology Park — Building C On site
Jaxon Construction Pty Ltd · Bentley · agreed 3 blocks · 12 weeks, off hire was due 21 Sept 2026 (6 days ago), courtesy days ran out 26 Sept 2026
$794.82
$794.82 × 1 block · 4 weeks
21 Sept 2026 – 19 Oct 2026
ItemInstalledOn site nowRatePer block× 1
GT-PED Pedestrian Gate Panel 3 3 $14.50/unit/block $43.50 $43.50
GT-VEH Vehicle Gate — 6m Double Swing 2 2 $48.00/unit/block $96.00 $96.00
SIGN-SITE Site Safety Sign 4 4 $4.50/unit/block $18.00 $18.00
TF-BRC Temporary Fence — Standard Braced 307.2 m 271.2 m −36 $2.35/m/block $637.32 $637.32

This site had 307 m installed and now has 271 m on it — some of it has already been collected, so continuation is charged on 271 m.

J-26-0122 Wanneroo Road Retail Pad On site
BGC Construction Pty Ltd · Landsdale · agreed 2 blocks · 8 weeks, off hire was due 08 Sept 2026 (19 days ago), courtesy days ran out 13 Sept 2026
$665.10
$665.10 × 1 block · 4 weeks
08 Sept 2026 – 06 Oct 2026
ItemInstalledOn site nowRatePer block× 1
GT-PED Pedestrian Gate Panel 3 3 $14.50/unit/block $43.50 $43.50
GT-VEH Vehicle Gate — 6m Double Swing 2 2 $48.00/unit/block $96.00 $96.00
SIGN-SITE Site Safety Sign 4 4 $4.50/unit/block $18.00 $18.00
TF-BRC Temporary Fence — Standard Braced 216 m 216 m $2.35/m/block $507.60 $507.60
J-26-0136 Baldivis — Rivergums Release 9 On site
Dale Alcock Homes Pty Ltd · Baldivis · agreed 3 blocks · 12 weeks, off hire was due 11 Aug 2026 (47 days ago), courtesy days ran out 16 Aug 2026
$464.08
$232.04 × 2 blocks · 8 weeks
11 Aug 2026 – 06 Oct 2026
ItemInstalledOn site nowRatePer block× 2
GT-PED Pedestrian Gate Panel 2 2 $14.50/unit/block $29.00 $58.00
TF-STD Temporary Fence — Standard 96 m 112.8 m +17 $1.80/m/block $203.04 $406.08

This site had 96 m installed and now has 113 m on it — extra runs went in during the hire, so continuation is charged on 113 m.

J-26-0139 Piara Waters — Fairway Estate Off hire requested
Summit Homes Group · Piara Waters · agreed 2 blocks · 8 weeks, off hire was due 07 Aug 2026 (51 days ago), courtesy days ran out 12 Aug 2026
$429.52
$214.76 × 2 blocks · 8 weeks
07 Aug 2026 – 02 Oct 2026
ItemInstalledOn site nowRatePer block× 2
GT-PED Pedestrian Gate Panel 2 2 $14.50/unit/block $29.00 $58.00
TF-STD Temporary Fence — Standard 103.2 m 103.2 m $1.80/m/block $185.76 $371.52
12 jobs selected · $21,969.81 ex GST, $24,166.79 inc

Worked out and waiting to be checked

3 sitting in the approval queue — they are not offered again above Go to the queue
InvoiceJobCustomerPeriodEx GST
INV-26-1079 J-26-0128 PACT Construction Pty Ltd 03 Aug 2026 – 31 Aug 2026 $663.96
INV-26-1078 J-26-0119 Georgiou Group Pty Ltd 03 Aug 2026 – 31 Aug 2026 $2,972.20
INV-26-1077 J-26-0118 Georgiou Group Pty Ltd 03 Aug 2026 – 31 Aug 2026 $1,834.24

Inside their courtesy days

past the hire end date but not charged — the 5-day grace before continuation starts
JobSiteCustomerOn siteHire endedCharges fromThen
J-26-0121 Hasler Road Commercial — Lot 447
Osborne Park
BGC Construction Pty Ltd 492 m 25 Sept 2026 30 Sept 2026
in 3 days
$1,327/block

If the gear comes back before that date there is nothing to charge. It is not mentioned on the quote or the invoice — it just sits here so nobody bills inside it by accident.

Reaching their off-hire date soon

still inside the agreed period — they will start accruing unless the gear comes back
JobSiteCustomerOn siteOff hire dueWould accrue
J-26-0133 Wangara Industrial — Lot 62
Wangara
Devlyn Australia Pty Ltd 252 m 12 Oct 2026
in 15 days
$750/block
J-26-0135 Alkimos Beach — Sanctuary Estate
Alkimos
Dale Alcock Homes Pty Ltd 70 m 15 Oct 2026
in 18 days
$154/block

Continuation invoices already raised

8 of them, $19,805 ex GST
InvoiceJobCustomerPeriodStatusEx GST
INV-26-1079 J-26-0128 PACT Construction Pty Ltd 03 Aug 2026 – 31 Aug 2026 Draft $663.96
INV-26-1078 J-26-0119 Georgiou Group Pty Ltd 03 Aug 2026 – 31 Aug 2026 Draft $2,972.20
INV-26-1077 J-26-0118 Georgiou Group Pty Ltd 03 Aug 2026 – 31 Aug 2026 Draft $1,834.24
INV-26-1031 J-26-0129 Perkins Builders Pty Ltd 17 July 2026 – 14 Aug 2026 Sent $2,251.89
INV-26-1028 J-26-0128 PACT Construction Pty Ltd 06 July 2026 – 03 Aug 2026 Sent $663.96
INV-26-1015 J-26-0119 Georgiou Group Pty Ltd 06 July 2026 – 03 Aug 2026 Sent $2,972.20
INV-26-1055 J-26-0147 Main Roads Western Australia 24 Apr 2026 – 22 May 2026 Paid $2,859.20
INV-26-1066 J-26-0150 City of Stirling 09 Jan 2026 – 06 Feb 2026 Paid $5,587.50