INV-26-1021
Install Overdue Xero INV-9015ADCO Constructions (WA) Pty Ltd · J-26-0124 Murray Street Serviced Apartments
All Fence U Rent Pty Ltd · ABN 24 128 604 973
80 Collingwood St, Osborne Park WA 6017
0408 877 300 · hire@allfenceurent.com.au
100% WA owned and operated
80 Collingwood St, Osborne Park WA 6017
0408 877 300 · hire@allfenceurent.com.au
100% WA owned and operated
Tax invoice
INV-26-1021
27 July 2026
Period 27 July 2026 – 27 Jan 2027
Invoice to
ADCO Constructions (WA) Pty Ltd
Nadine Frost
Level 2, 190 St Georges Tce
Perth WA 6000
ABN 16 000 837 138
Level 2, 190 St Georges Tce
Perth WA 6000
ABN 16 000 837 138
Site
Murray Street Serviced Apartments
482 Murray St
Perth WA 6000
Job J-26-0124 · your PO ADCO-21042
Braced with Scaf Net
Perth WA 6000
Job J-26-0124 · your PO ADCO-21042
Braced with Scaf Net
Issued
27 July 2026
Terms
45 days EOM
Due
31 July 2026
Status
8 days ago
Delivery
Truck to site and back. $220.00| Description | Qty | Unit | Amount |
|---|---|---|---|
| Delivery & cartage — Perth metroDEL-METRO | 1 | $220.00 | $220.00 |
Install
Charged on the quantity the crew actually installed. $860.12| Description | Qty | Unit | Amount |
|---|---|---|---|
| Install — Temporary Fence — Braced with Scaf NetTF-SCAF | 220.8 m | $2.65 | $585.12 |
| Install — Scaf NetSCAF-NET | 215 m | $1.20 | $258.00 |
| Install — Pedestrian Gate PanelGT-PED | 2 | $8.50 | $17.00 |
Hire
The agreed hire period, paid up front. $8,002.56| Description | Qty | Unit | Amount |
|---|---|---|---|
| Hire — Temporary Fence — Braced with Scaf Net · 6 monthsTF-SCAF | 220.8 m | $19.20 | $4,239.36 |
| Hire — Scaf Net · 6 monthsSCAF-NET | 215 m | $7.20 | $1,548.00 |
| Hire — Anti-Tamper Clamp · 6 monthsCLP-ANTI | 174 | $10.80 | $1,879.20 |
| Hire — Site Safety Sign · 6 monthsSIGN-SITE | 6 | $27.00 | $162.00 |
| Hire — Pedestrian Gate Panel · 6 monthsGT-PED | 2 | $87.00 | $174.00 |
Final collection
Charged now so that if nothing else happens on site, the job is paid in full. $670.18| Description | Qty | Unit | Amount |
|---|---|---|---|
| Final collection — Temporary Fence — Braced with Scaf NetTF-SCAF | 220.8 m | $2.10 | $463.68 |
| Final collection — Scaf NetSCAF-NET | 215 m | $0.90 | $193.50 |
| Final collection — Pedestrian Gate PanelGT-PED | 2 | $6.50 | $13.00 |
- Subtotal ex GST
- $9,752.86
- GST 10%
- $975.29
- Total due
- $10,728.15
Payment
NAB · BSB 086-006 · Account 44 921 8807
All Fence U Rent Pty Ltd
Please quote INV-26-1021 as the reference.
All Fence U Rent Pty Ltd
Please quote INV-26-1021 as the reference.
Notes
The final collection is included on this invoice. If no further visit is needed, this job is paid in full.
All Fence U Rent Pty Ltd · ABN 24 128 604 973 · 80 Collingwood St, Osborne Park WA 6017 · 0408 877 300 · hire@allfenceurent.com.au
Amount
$10,728.15
$9,752.86 ex GST + $975.29 GST
- Kind
- Install
- Lines
- 12
- Terms
- 45 days EOM
- Xero
- INV-9015
Why this is the amount
Billed on the quantity the crew installed, not on the estimate that went out on the truck. The final collection is already on it, so if nothing else happens on this site the job is paid in full from day one. If it runs past 6 months, continuation of hire picks up from 27 Jan 2027.
See the estimated / loaded / installed columns →