All Fence
All Fence U Rent
Yard & Fleet Demo 18% of the fleet is out
Xero · synced 9:14 am 08 Aug 2026

Yard & Fleet

The other side of the same ledger. What is on hire here is exactly the sum of what is standing on every site — the identical movements, read by item instead of by job. What is left in the yard is the fleet less what is out, less what is on the repair rack, less what never came back.

Fleet utilisation
18%
21,330 of 115,799 units out
In the yard
94,358
available to load
On the repair rack
29
came back damaged
Never came back
82
written off and charged on
Fleet at replacement
$6,269,425
across 34 lines
1 lines are more than 70% out Total Block Out Screening (73%, 896 m left)

Out against owned

the ten lines with most on hire

Depots

Osborne Park yard
80 Collingwood St, Osborne Park WA
84,865 in yard 20,283 on hire 30 lines
Kwinana satellite yard
12 Sudlow Rd, Naval Base WA
9,493 in yard 1,047 on hire 4 lines

Every line in the fleet

34 lines
ItemFamilyBay FleetOn hire In yardRepair LostUtilisation Hire /mo
SC-BLOK
Total Block Out Screening
Shade cloth & screening C1 · OSB 3,360 m 2,437 m 896 m 27 m
73%
$1.75
TF-BRC
Temporary Fence — Standard Braced
Temporary fencing A2 · OSB 9,600 m 6,120 m 3,470.4 m 9.6 m
64%
$2.35
FT-BLOK
Fence Foot — Concrete Block
Accessories YARD · OSB 4,600 2,573 2,004 5 18
56%
BRC-KIT
Bracing Kit
Accessories B1 · OSB 1,800 837 959 1 3
47%
GT-VEH
Vehicle Gate — 6m Double Swing
Gates & access D2 · OSB 90 28 62
31%
$48.00
CLP-STD
Fence Clamp — Standard
Accessories A1 · OSB 16,000 4,375 11,600 9 16
27%
FT-PLAS
Fence Foot — Plastic Filled
Accessories E2 · OSB 12,000 2,859 9,135 6
24%
SIGN-SITE
Site Safety Sign
Accessories B3 · OSB 620 115 502 1 2
19%
$4.50
TF-SCAF
Temporary Fence — Braced with Scaf Net
Temporary fencing A3 · OSB 4,200 m 604.8 m 3,595.2 m
14%
$3.20
CLP-ANTI
Anti-Tamper Clamp
Accessories A2 · KWN 3,400 464 2,936
14%
$1.80
GT-PED
Pedestrian Gate Panel
Gates & access D1 · OSB 340 41 299
12%
$14.50
SCAF-NET
Scaf Net
Shade cloth & screening C2 · KWN 5,280 m 583 m 4,697 m
11%
$1.20
BIN-3
Containment Bin — 3m³
Containment A3 · OSB 46 3 41 1 1
7%
$95.00
WPF-STD
White Picket Fence
Picket & hoarding C2 · OSB 2,200 m 88 m 2,112 m
4%
$4.20
BW-COIL
Barbed Wire Coil — 100m
Accessories B2 · OSB 240 8 232
3%
$32.00
MNR-STD
Manor Fence
Picket & hoarding D1 · OSB 1,400 m 38 m 1,362 m
3%
$4.60
TF-STD
Temporary Fence — Standard
Temporary fencing A1 · OSB 14,400 m 156 m 14,238.4 m 3.2 m 2.4 m
1%
$1.80
TF-BLOK
Temporary Fence — Standard Braced with Total Block Out
Temporary fencing B1 · OSB 2,640 m 0 m 2,640 m
0%
$3.95
TF-HIGH
High Fence — 3.0m
Temporary fencing B2 · OSB 1,800 m 0 m 1,800 m
0%
$4.80
TF-POOL
Temporary Pool Fence
Temporary fencing B3 · OSB 2,415 m 0 m 2,415 m
0%
$2.65
TF-DOG
Dog Proofing Fence
Temporary fencing C1 · KWN 1,440 m 0 m 1,440 m
0%
$2.10
WPH-STD
White Picket Hoarding
Picket & hoarding D2 · OSB 960 m 0 m 960 m
0%
$6.40
CCB-STD
Crowd Control Barrier
Barriers E1 · OSB 2,600 0 2,600
0%
$8.50
CCB-GATE
Crowd Control Barrier — Gate Section
Barriers E2 · OSB 120 0 119 1
0%
$16.00
PB-PUNT
Punter Barrier
Barriers YARD · OSB 900 0 898 2
0%
$14.50
PB-STAGE
Stage Barrier
Barriers A1 · KWN 420 0 420
0%
$26.00
PB-FL
Framelock Barrier
Barriers A2 · OSB 640 0 640
0%
$19.50
BIN-6
Containment Bin — 6m³
Containment B1 · OSB 28 0 28
0%
$145.00
SC-STD
Shade Cloth
Shade cloth & screening B2 · OSB 9,600 m 0 m 9,597 m 3 m
0%
$0.95
SC-PRINT
Printed Shade Cloth
Shade cloth & screening B3 · OSB 1,800 m 0 m 1,800 m
0%
$2.60
GT-SLIDE
Sliding Gate Panel
Gates & access E1 · OSB 60 0 60
0%
$32.00
BRC-STAY
Bracing Stay
Accessories A3 · OSB 5,200 0 5,200
0%
SAND-BAG
Sand Bag Ballast
Accessories C1 · OSB 2,400 0 2,400
0%
STAR-PKT
Star Picket — 1.8m
Accessories C2 · OSB 3,200 0 3,200
0%

Yard ledger

every dispatch, return, repair and write-off — the last 50
WhenItemMovementQuantityAgainstNote
07 Aug 2026, 9:46 am GT-VEH
Vehicle Gate — 6m Double Swing
Dispatch −2 SV-26-0406
St John of God Midland — East Wing
J-26-0127 — St John of God Midland — East Wing
07 Aug 2026, 9:46 am GT-PED
Pedestrian Gate Panel
Dispatch −4 SV-26-0406
St John of God Midland — East Wing
J-26-0127 — St John of God Midland — East Wing
07 Aug 2026, 9:46 am SIGN-SITE
Site Safety Sign
Dispatch −7 SV-26-0406
St John of God Midland — East Wing
J-26-0127 — St John of God Midland — East Wing
07 Aug 2026, 9:46 am CLP-STD
Fence Clamp — Standard
Dispatch −285 SV-26-0406
St John of God Midland — East Wing
J-26-0127 — St John of God Midland — East Wing
07 Aug 2026, 9:46 am FT-PLAS
Fence Foot — Plastic Filled
Dispatch −330 SV-26-0406
St John of God Midland — East Wing
J-26-0127 — St John of God Midland — East Wing
07 Aug 2026, 9:46 am BRC-KIT
Bracing Kit
Dispatch −47 SV-26-0406
St John of God Midland — East Wing
J-26-0127 — St John of God Midland — East Wing
07 Aug 2026, 9:46 am TF-BRC
Temporary Fence — Standard Braced
Dispatch −417.6 m SV-26-0406
St John of God Midland — East Wing
J-26-0127 — St John of God Midland — East Wing
04 Aug 2026, 8:31 am BIN-3
Containment Bin — 3m³
Dispatch −3 SV-26-0405
Newman Health Campus Upgrade
J-26-0126 — Newman Health Campus Upgrade
04 Aug 2026, 8:31 am SIGN-SITE
Site Safety Sign
Dispatch −13 SV-26-0405
Newman Health Campus Upgrade
J-26-0126 — Newman Health Campus Upgrade
04 Aug 2026, 8:31 am BW-COIL
Barbed Wire Coil — 100m
Dispatch −8 SV-26-0405
Newman Health Campus Upgrade
J-26-0126 — Newman Health Campus Upgrade
04 Aug 2026, 8:31 am CLP-STD
Fence Clamp — Standard
Dispatch −525 SV-26-0405
Newman Health Campus Upgrade
J-26-0126 — Newman Health Campus Upgrade
04 Aug 2026, 8:31 am FT-BLOK
Fence Foot — Concrete Block
Dispatch −584 SV-26-0405
Newman Health Campus Upgrade
J-26-0126 — Newman Health Campus Upgrade
04 Aug 2026, 8:31 am BRC-KIT
Bracing Kit
Dispatch −113 SV-26-0405
Newman Health Campus Upgrade
J-26-0126 — Newman Health Campus Upgrade
04 Aug 2026, 8:31 am SC-BLOK
Total Block Out Screening
Dispatch −538 m SV-26-0405
Newman Health Campus Upgrade
J-26-0126 — Newman Health Campus Upgrade
04 Aug 2026, 8:31 am TF-BRC
Temporary Fence — Standard Braced
Dispatch −648 m SV-26-0405
Newman Health Campus Upgrade
J-26-0126 — Newman Health Campus Upgrade
03 Aug 2026, 11:18 am GT-VEH
Vehicle Gate — 6m Double Swing
Dispatch −2 SV-26-0404
Scarborough Beach Foreshore — Stage 3
J-26-0125 — Scarborough Beach Foreshore — Stage 3
03 Aug 2026, 11:18 am GT-PED
Pedestrian Gate Panel
Dispatch −4 SV-26-0404
Scarborough Beach Foreshore — Stage 3
J-26-0125 — Scarborough Beach Foreshore — Stage 3
03 Aug 2026, 11:18 am SIGN-SITE
Site Safety Sign
Dispatch −6 SV-26-0404
Scarborough Beach Foreshore — Stage 3
J-26-0125 — Scarborough Beach Foreshore — Stage 3
03 Aug 2026, 11:18 am CLP-STD
Fence Clamp — Standard
Dispatch −276 SV-26-0404
Scarborough Beach Foreshore — Stage 3
J-26-0125 — Scarborough Beach Foreshore — Stage 3
03 Aug 2026, 11:18 am FT-PLAS
Fence Foot — Plastic Filled
Dispatch −332 SV-26-0404
Scarborough Beach Foreshore — Stage 3
J-26-0125 — Scarborough Beach Foreshore — Stage 3
03 Aug 2026, 11:18 am BRC-KIT
Bracing Kit
Dispatch −43 SV-26-0404
Scarborough Beach Foreshore — Stage 3
J-26-0125 — Scarborough Beach Foreshore — Stage 3
03 Aug 2026, 11:18 am TF-BRC
Temporary Fence — Standard Braced
Dispatch −398.4 m SV-26-0404
Scarborough Beach Foreshore — Stage 3
J-26-0125 — Scarborough Beach Foreshore — Stage 3
29 July 2026, 2:30 pm CLP-STD
Fence Clamp — Standard
Repair YARD 13 back on the rack after repair
28 July 2026, 8:40 am FT-PLAS
Fence Foot — Plastic Filled
Dispatch −86 SV-26-0422
Wangara Industrial — Lot 62
J-26-0133 — added on site
28 July 2026, 8:40 am BRC-KIT
Bracing Kit
Dispatch −10 SV-26-0422
Wangara Industrial — Lot 62
J-26-0133 — added on site
28 July 2026, 8:40 am TF-BRC
Temporary Fence — Standard Braced
Dispatch −88.8 m SV-26-0422
Wangara Industrial — Lot 62
J-26-0133 — added on site
28 July 2026, 8:11 am GT-PED
Pedestrian Gate Panel
Dispatch −2 SV-26-0403
Murray Street Serviced Apartments
J-26-0124 — Murray Street Serviced Apartments
28 July 2026, 8:11 am SIGN-SITE
Site Safety Sign
Dispatch −6 SV-26-0403
Murray Street Serviced Apartments
J-26-0124 — Murray Street Serviced Apartments
28 July 2026, 8:11 am CLP-ANTI
Anti-Tamper Clamp
Dispatch −174 SV-26-0403
Murray Street Serviced Apartments
J-26-0124 — Murray Street Serviced Apartments
28 July 2026, 8:11 am FT-BLOK
Fence Foot — Concrete Block
Dispatch −190 SV-26-0403
Murray Street Serviced Apartments
J-26-0124 — Murray Street Serviced Apartments
28 July 2026, 8:11 am BRC-KIT
Bracing Kit
Dispatch −42 SV-26-0403
Murray Street Serviced Apartments
J-26-0124 — Murray Street Serviced Apartments
28 July 2026, 8:11 am SCAF-NET
Scaf Net
Dispatch −215 m SV-26-0403
Murray Street Serviced Apartments
J-26-0124 — Murray Street Serviced Apartments
28 July 2026, 8:11 am TF-SCAF
Temporary Fence — Braced with Scaf Net
Dispatch −220.8 m SV-26-0403
Murray Street Serviced Apartments
J-26-0124 — Murray Street Serviced Apartments
25 July 2026, 2:30 pm BIN-3
Containment Bin — 3m³
Repair YARD 1 back on the rack after repair
24 July 2026, 2:39 pm BRC-KIT
Bracing Kit
Dispatch −4 SV-26-0416
Innaloo Primary School — New Block
J-26-0130 — added on site
24 July 2026, 2:39 pm TF-BRC
Temporary Fence — Standard Braced
Dispatch −52.8 m SV-26-0416
Innaloo Primary School — New Block
J-26-0130 — added on site
24 July 2026, 2:30 pm BRC-KIT
Bracing Kit
Repair YARD 2 back on the rack after repair
21 July 2026, 9:22 am GT-PED
Pedestrian Gate Panel
Dispatch −2 SV-26-0402
Curtin University — Building 408 Refurb
J-26-0123 — Curtin University — Building 408 Refurb
21 July 2026, 9:22 am SIGN-SITE
Site Safety Sign
Dispatch −5 SV-26-0402
Curtin University — Building 408 Refurb
J-26-0123 — Curtin University — Building 408 Refurb
21 July 2026, 9:22 am CLP-ANTI
Anti-Tamper Clamp
Dispatch −124 SV-26-0402
Curtin University — Building 408 Refurb
J-26-0123 — Curtin University — Building 408 Refurb
21 July 2026, 9:22 am FT-BLOK
Fence Foot — Concrete Block
Dispatch −129 SV-26-0402
Curtin University — Building 408 Refurb
J-26-0123 — Curtin University — Building 408 Refurb
21 July 2026, 9:22 am BRC-KIT
Bracing Kit
Dispatch −29 SV-26-0402
Curtin University — Building 408 Refurb
J-26-0123 — Curtin University — Building 408 Refurb
21 July 2026, 9:22 am SCAF-NET
Scaf Net
Dispatch −153 m SV-26-0402
Curtin University — Building 408 Refurb
J-26-0123 — Curtin University — Building 408 Refurb
21 July 2026, 9:22 am TF-SCAF
Temporary Fence — Braced with Scaf Net
Dispatch −175.2 m SV-26-0402
Curtin University — Building 408 Refurb
J-26-0123 — Curtin University — Building 408 Refurb
20 July 2026, 9:10 am GT-PED
Pedestrian Gate Panel
Dispatch −2 SV-26-0425
Alkimos Beach — Sanctuary Estate
J-26-0135 — Alkimos Beach — Sanctuary Estate
20 July 2026, 9:10 am CLP-STD
Fence Clamp — Standard
Dispatch −60 SV-26-0425
Alkimos Beach — Sanctuary Estate
J-26-0135 — Alkimos Beach — Sanctuary Estate
20 July 2026, 9:10 am FT-PLAS
Fence Foot — Plastic Filled
Dispatch −152 SV-26-0425
Alkimos Beach — Sanctuary Estate
J-26-0135 — Alkimos Beach — Sanctuary Estate
20 July 2026, 9:10 am TF-STD
Temporary Fence — Standard
Dispatch −81.6 m SV-26-0425
Alkimos Beach — Sanctuary Estate
J-26-0135 — Alkimos Beach — Sanctuary Estate
20 July 2026, 8:34 am BRC-KIT
Bracing Kit
Dispatch −11 SV-26-0400
Hasler Road Commercial — Lot 447
J-26-0121 — added on site
20 July 2026, 8:34 am TF-BRC
Temporary Fence — Standard Braced
Dispatch −72 m SV-26-0400
Hasler Road Commercial — Lot 447
J-26-0121 — added on site