BW-COIL
AccessoriesBarbed Wire Coil — 100m · Three-strand barbed topping, 100m coil, brackets included
Fleet owned
240
$24,480 at replacement
On hire
8
across 1 sites
In the yard
232
bay B2 · Osborne Park
Repair / written off
0 / 0
damaged and never returned
Utilisation
3%
earning $256/month
Where it is
every site holding this item right now 8 across 1 sites| Job | Site | Customer | Status | On site | Off hire due |
|---|---|---|---|---|---|
| J-26-0126 | Newman Health Campus Upgrade Newman | Doric Group Pty Ltd | On site | 8 | 03 Sept 2026 |
| Total on hire — the same figure the yard page shows | 8 | ||||
Rates
Edit →- Hire, per unit per month
- $32.00
- Continuation of hire
- $32.00
- Install
- $18.00
- Final collection
- $12.00
- Damage
- $24.00
- Not returned
- $84.00
- Replacement cost
- $102.00
Movement history
every time this item left the yard or came back| When | Movement | Quantity | Visit | Site | Note |
|---|---|---|---|---|---|
| 04 Aug 2026, 8:31 am | Dispatch | −8 | SV-26-0405 | Newman Health Campus Upgrade | J-26-0126 — Newman Health Campus Upgrade |
| 09 June 2026, 1:18 pm | Return | +9 | SV-26-0444 | Iron Bridge — Village Extension | J-26-0145 — final collection |
| 02 Apr 2026, 12:52 pm | Return | +8 | SV-26-0447 | Collie Battery Site — Perimeter | J-26-0146 — final collection |
| 26 Jan 2026, 10:57 am | Dispatch | −9 | SV-26-0442 | Iron Bridge — Village Extension | J-26-0145 — Iron Bridge — Village Extension |
| 22 Dec 2025, 6:35 am | Dispatch | −8 | SV-26-0445 | Collie Battery Site — Perimeter | J-26-0146 — Collie Battery Site — Perimeter |