BW-COIL
AccessoriesBarbed Wire Coil — 100m · Three-strand barbed topping, 100m coil, brackets included
Fleet owned
240
$24,480 at replacement
On hire
10
across 1 sites
In the yard
230
bay B2 · Osborne Park
Repair / written off
0 / 0
damaged and never returned
Utilisation
4%
earning $320/month
Where it is
every site holding this item right now 10 across 1 sites| Job | Site | Customer | Status | On site | Off hire due |
|---|---|---|---|---|---|
| J-26-0126 | Newman Health Campus Upgrade Newman | Doric Group Pty Ltd | On site | 10 | 07 Sept 2026 |
| Total on hire — the same figure the yard page shows | 10 | ||||
Rates
Edit →- Hire, per unit per block
- $32.00
- Continuation of hire
- $32.00
- Install
- $18.00
- Final collection
- $12.00
- Damage
- $24.00
- Not returned
- $84.00
- Replacement cost
- $102.00
Movement history
every time this item left the yard or came back| When | Movement | Quantity | Visit | Site | Note |
|---|---|---|---|---|---|
| 10 Aug 2026, 5:56 pm | Dispatch | −10 | SV-26-0405 | Newman Health Campus Upgrade | J-26-0126 — Newman Health Campus Upgrade |
| 29 June 2026, 4:01 pm | Return | +7 | SV-26-0444 | Collie Battery Site — Perimeter | J-26-0146 — final collection |
| 27 Feb 2026, 5:24 pm | Dispatch | −7 | SV-26-0440 | Collie Battery Site — Perimeter | J-26-0146 — Collie Battery Site — Perimeter |