J-26-0126
On siteNewman Health Campus Upgrade · Newman Dr, Newman 6753 · Combination of Fence Types · Mine site
On site right now
the sum of every completed movement on this job — not the estimate, not the load 1,186 m · 1,246 units| Item | Estimated | Loaded | Installed | Since install | On site now | Hire /mo |
|---|---|---|---|---|---|---|
| TF-BRC Temporary Fence — Standard Braced | 556.8 m | 664.8 m | 648 m | — | 648 m | $2.35 |
| SC-BLOK Total Block Out Screening | 503 m | 582 m | 538 m | — | 538 m | $1.75 |
| BRC-KIT Bracing Kit | 93 | 121 | 113 | — | 113 | — |
| FT-BLOK Fence Foot — Concrete Block | 503 | 647 | 584 | — | 584 | — |
| CLP-STD Fence Clamp — Standard | 476 | 563 | 525 | — | 525 | — |
| BW-COIL Barbed Wire Coil — 100m | 8 | 9 | 8 | — | 8 | $32.00 |
| SIGN-SITE Site Safety Sign | 11 | 13 | 13 | — | 13 | $4.50 |
| BIN-3 Containment Bin — 3m³ | 3 | 4 | 3 | — | 3 | $95.00 |
| Fence, metres | 1,060 m | 1,247 m | 1,186 m | +0 m | 1,186 m |
They asked for 1,060 m, the yard sent 1,247 m so the crew would not run short, and 1,186 m went in. The install invoice bills the installed figure — $8,174.30 ex GST, against $7,445.86 had it been billed on the estimate (+$728).
How it got there
1 completed visit since 03 Aug 2026.
The hire
- Booked
- 14 July 2026
- Installed
- 03 Aug 2026
- Agreed period
- 1 month
- Off hire due
- 03 Sept 2026in 26 days
- Site contact
- Danny Fitzhardinge0438 220 617
- Booked by
- AL
Site visits
every trip a crew has made or is booked to make — each one moves the running total| Visit | Type | Date | Crew | Status | What moved | Net metres | Invoice |
|---|---|---|---|---|---|---|---|
| SV-26-0405 docket D40274 | Install | 03 Aug 2026 PM | CREW-4 | Completed | +648 m TF-BRC +538 m SC-BLOK +113 BRC-KIT +584 FT-BLOK +4 | +1,186 m | — |
| SV-26-0465 | Add | 09 Aug 2026 AM | CREW-2 | Dispatched | +88.8 m TF-BRC +173 m SC-BLOK +12 BRC-KIT | +261.8 m | — |
| SV-26-0469 | Collect | 09 Aug 2026 AM | CREW-1 | Scheduled | −249.6 m TF-BRC −106 m SC-BLOK −34 BRC-KIT | −355.6 m | — |
| SV-26-0473 | Repair | 10 Aug 2026 AM | CREW-5 | Scheduled | +19.2 m TF-BRC +24 m SC-BLOK +1 BRC-KIT | +43.2 m | no charge |
| SV-26-0477 | Collect | 11 Aug 2026 AM | CREW-4 | Scheduled | −139.2 m TF-BRC −197 m SC-BLOK −16 BRC-KIT | −336.2 m | — |
| SV-26-0481 | Collect | 12 Aug 2026 AM | CREW-3 | Scheduled | −69.6 m TF-BRC −107 m SC-BLOK −14 BRC-KIT | −176.6 m | — |
| SV-26-0485 | Add | 13 Aug 2026 AM | CREW-2 | Scheduled | +43.2 m TF-BRC | +43.2 m | — |
| SV-26-0489 | Add | 16 Aug 2026 AM | CREW-1 | Scheduled | +108 m TF-BRC | +108 m | — |
| SV-26-0493 | Inspection | 17 Aug 2026 AM | CREW-5 | Scheduled | +16.8 m TF-BRC | +16.8 m | no charge |
| SV-26-0497 | Add | 23 Aug 2026 AM | CREW-4 | Scheduled | +117.6 m TF-BRC +102 m SC-BLOK +22 BRC-KIT | +219.6 m | — |
| SV-26-0501 | Add | 30 Aug 2026 AM | CREW-3 | Scheduled | +103.2 m TF-BRC +113 m SC-BLOK | +216.2 m | — |
10 visits still open.
Invoices raised on this job
Account customer — invoiced on 30 days EOM| Invoice | What for | Issued | Period | Status | Ex GST |
|---|---|---|---|---|---|
| Nothing invoiced on this job yet. | |||||
Customer
Doric Group Pty Ltd
Account 30 days EOM
- Contact
- Callum Reith
- Phone
- 08 9214 2000
- ABN
- 22 097 372 466
- Segment
- Building & construction
Account customer, so this job is invoiced once the install is done and falls due on 30 days eom.
Log a site visit
What the crew took out, or what came back. Completing it posts the movements and the running total, the yard and the continuation rate all follow.
Edit J-26-0126
Site details and the agreed hire period.