J-26-0126

On site Continuation of hire

Newman Health Campus Upgrade · Newman Dr, Newman 6753 · Combination of Fence Types · Mine site

On site right now

the sum of every completed movement on this job — not the estimate, not the load 1,543 m · 1,373 units
ItemEstimatedLoadedInstalled Since installOn site nowHire /block
TF-BRC
Temporary Fence — Standard Braced
660 m 763.2 m 705.6 m — 705.6 m $2.35
SC-BLOK
Total Block Out Screening
596 m 893 m 837 m — 837 m $1.75
BRC-KIT
Bracing Kit
110 142 128 — 128 —
FT-BLOK
Fence Foot — Concrete Block
596 705 658 — 658 —
CLP-STD
Fence Clamp — Standard
565 631 559 — 559 —
BW-COIL
Barbed Wire Coil — 100m
9 10 10 — 10 $32.00
SIGN-SITE
Site Safety Sign
13 16 14 — 14 $4.50
BIN-3
Containment Bin — 3m³
3 4 4 — 4 $95.00
Fence, metres 1,256 m 1,656 m 1,543 m +0 m 1,543 m

They asked for 1,256 m, the yard sent 1,656 m so the crew would not run short, and 1,543 m went in. The install invoice bills the installed figure — $10,160.52 ex GST, against $8,565.90 had it been billed on the estimate (+$1,595).

How it got there

1 completed visit since 10 Aug 2026.

The hire

Booked
31 July 2026
Installed
10 Aug 2026
Agreed period
1 block · 4 weeks
Off hire due
07 Sept 202620 days ago
Site contact
Danny Fitzhardinge
0438 220 617
Their PO
DORC-21056
Booked by
DV

Continuation of hire

past 07 Sept 2026 by 1 block · 4 weeks — charged per metre, per four-week block, on what is on site now
ItemOn siteRatePer block× 1
BIN-3
Containment Bin — 3m³
4 $95.00 / unit / month $380.00 $380.00
BW-COIL
Barbed Wire Coil — 100m
10 $32.00 / unit / month $320.00 $320.00
SC-BLOK
Total Block Out Screening
837 m $1.75 / m / month $1,464.75 $1,464.75
SIGN-SITE
Site Safety Sign
14 $4.50 / unit / month $63.00 $63.00
TF-BRC
Temporary Fence — Standard Braced
705.6 m $2.35 / m / month $1,658.16 $1,658.16
Accrued and not yet raised $3,885.91 $3,885.91

Site visits

every trip a crew has made or is booked to make — each one moves the running total
VisitTypeDateCrewStatusWhat movedNet metresInvoice
SV-26-0405
docket D40274
Install 10 Aug 2026
PM
CREW-4 Completed
+705.6 m TF-BRC +837 m SC-BLOK +128 BRC-KIT +658 FT-BLOK +4
+1,542.6 m —
SV-26-0468
docket D41881
Add 14 Aug 2026
AM
CREW-2 On site
+160.8 m TF-BRC +256 m SC-BLOK +22 BRC-KIT
+416.8 m —
SV-26-0490 Collect 20 Aug 2026
AM
CREW-4 Scheduled
−132 m TF-BRC −258 m SC-BLOK −19 BRC-KIT
−390 m —

2 visits still open.

Invoices raised on this job

Account customer — invoiced on 30 days EOM
InvoiceWhat forIssuedPeriodStatusEx GST
Nothing invoiced on this job yet.

Customer

Doric Group Pty Ltd
Account 30 days EOM
Contact
Callum Reith
Phone
08 9214 2000
ABN
22 097 372 466
Segment
Building & construction

Account customer, so this job is invoiced once the install is done and falls due on 30 days eom.

Photos and paperwork

4 photos off the crews' iPads, and every docket raised against this site
After
After SV-26-0468
Finished run
14 Aug 2026, 8:54 pm
Before
Before SV-26-0468
Before we started
14 Aug 2026, 4:19 pm
After
After SV-26-0405
Completed run, gate at the west end
10 Aug 2026, 5:56 pm
Before
Before SV-26-0405
Frontage before we started
10 Aug 2026, 3:22 pm
DocketVisitWhenCrewSigned on site byState
D40274 SV-26-0405 Install 10 Aug 2026 CREW-4 Danny Fitzhardinge Approved
D41881 SV-26-0468 Add 14 Aug 2026 CREW-2 Danny Fitzhardinge Submitted
— SV-26-0490 Collect 20 Aug 2026 CREW-4 — Not started