the sum of every completed movement on this job — not the estimate, not the load 1,543 m · 1,373 units| Item | Estimated | Loaded | Installed | Since install | On site now | Hire /block |
|---|---|---|---|---|---|---|
| TF-BRC Temporary Fence — Standard Braced | 660 m | 763.2 m | 705.6 m | — | 705.6 m | $2.35 |
| SC-BLOK Total Block Out Screening | 596 m | 893 m | 837 m | — | 837 m | $1.75 |
| BRC-KIT Bracing Kit | 110 | 142 | 128 | — | 128 | — |
| FT-BLOK Fence Foot — Concrete Block | 596 | 705 | 658 | — | 658 | — |
| CLP-STD Fence Clamp — Standard | 565 | 631 | 559 | — | 559 | — |
| BW-COIL Barbed Wire Coil — 100m | 9 | 10 | 10 | — | 10 | $32.00 |
| SIGN-SITE Site Safety Sign | 13 | 16 | 14 | — | 14 | $4.50 |
| BIN-3 Containment Bin — 3m³ | 3 | 4 | 4 | — | 4 | $95.00 |
| Fence, metres | 1,256 m | 1,656 m | 1,543 m | +0 m | 1,543 m |
They asked for 1,256 m, the yard sent 1,656 m so the crew would not run short, and 1,543 m went in. The install invoice bills the installed figure — $10,160.52 ex GST, against $8,565.90 had it been billed on the estimate (+$1,595).
How it got there
1 completed visit since 10 Aug 2026.
The hire
- Booked
- 31 July 2026
- Installed
- 10 Aug 2026
- Agreed period
- 1 block · 4 weeks
- Off hire due
- 07 Sept 202620 days ago
- Site contact
- Danny Fitzhardinge0438 220 617
- Their PO
- DORC-21056
- Booked by
- DV
Continuation of hire
past 07 Sept 2026 by 1 block · 4 weeks — charged per metre, per four-week block, on what is on site now| Item | On site | Rate | Per block | × 1 |
|---|---|---|---|---|
| BIN-3 Containment Bin — 3m³ | 4 | $95.00 / unit / month | $380.00 | $380.00 |
| BW-COIL Barbed Wire Coil — 100m | 10 | $32.00 / unit / month | $320.00 | $320.00 |
| SC-BLOK Total Block Out Screening | 837 m | $1.75 / m / month | $1,464.75 | $1,464.75 |
| SIGN-SITE Site Safety Sign | 14 | $4.50 / unit / month | $63.00 | $63.00 |
| TF-BRC Temporary Fence — Standard Braced | 705.6 m | $2.35 / m / month | $1,658.16 | $1,658.16 |
| Accrued and not yet raised | $3,885.91 | $3,885.91 | ||
Site visits
every trip a crew has made or is booked to make — each one moves the running total| Visit | Type | Date | Crew | Status | What moved | Net metres | Invoice |
|---|---|---|---|---|---|---|---|
| SV-26-0405 docket D40274 | Install | 10 Aug 2026 PM | CREW-4 | Completed | +705.6 m TF-BRC +837 m SC-BLOK +128 BRC-KIT +658 FT-BLOK +4 | +1,542.6 m | — |
| SV-26-0468 docket D41881 | Add | 14 Aug 2026 AM | CREW-2 | On site | +160.8 m TF-BRC +256 m SC-BLOK +22 BRC-KIT | +416.8 m | — |
| SV-26-0490 | Collect | 20 Aug 2026 AM | CREW-4 | Scheduled | −132 m TF-BRC −258 m SC-BLOK −19 BRC-KIT | −390 m | — |
2 visits still open.
Invoices raised on this job
Account customer — invoiced on 30 days EOM| Invoice | What for | Issued | Period | Status | Ex GST |
|---|---|---|---|---|---|
| Nothing invoiced on this job yet. | |||||
Customer
Doric Group Pty Ltd
Account 30 days EOM
- Contact
- Callum Reith
- Phone
- 08 9214 2000
- ABN
- 22 097 372 466
- Segment
- Building & construction
Account customer, so this job is invoiced once the install is done and falls due on 30 days eom.
Log a site visit
What the crew took out, or what came back. Completing it posts the movements and the running total, the yard and the continuation rate all follow.
Edit J-26-0126
Site details and the agreed hire period.
Photos and paperwork
4 photos off the crews' iPads, and every docket raised against this site After
After SV-26-0468
Finished run
14 Aug 2026, 8:54 pm
Before
Before SV-26-0468
Before we started
14 Aug 2026, 4:19 pm
After
After SV-26-0405
Completed run, gate at the west end
10 Aug 2026, 5:56 pm
Before
Before SV-26-0405
Frontage before we started
10 Aug 2026, 3:22 pm
| Docket | Visit | When | Crew | Signed on site by | State | |
|---|---|---|---|---|---|---|
| D40274 | SV-26-0405 Install | 10 Aug 2026 | CREW-4 | Danny Fitzhardinge | Approved | |
| D41881 | SV-26-0468 Add | 14 Aug 2026 | CREW-2 | Danny Fitzhardinge | Submitted | |
| — | SV-26-0490 Collect | 20 Aug 2026 | CREW-4 | — | Not started |