SV-26-0405
03 Aug 2026
Docket D40274
Site
Newman Health Campus Upgrade
Newman Dr
Newman WA 6753
Site contact Danny Fitzhardinge · 0438 220 617
Newman WA 6753
Site contact Danny Fitzhardinge · 0438 220 617
Customer
Doric Group Pty Ltd
ABN 22 097 372 466
Callum Reith
08 9214 2000
Callum Reith
08 9214 2000
Job
J-26-0126
Crew
CREW-4Cam
Truck
1HDN 621
Completed
04 Aug 2026, 8:31 am
| Item | Description | Out to site | Back to yard | Condition | On site after |
|---|---|---|---|---|---|
| TF-BRC | Temporary Fence — Standard Braced 2.4m × 1.8m panel with bracing stay and second foot every third panel | 648 m | — | Good | 648 m |
| SC-BLOK | Total Block Out Screening Solid block-out screening, 1.8m, wind-slit at 1.2m centres | 538 m | — | Good | 538 m |
| BRC-KIT | Bracing Kit Stay, second foot and two clamps, made up in the yard | 113 | — | Good | 113 |
| FT-BLOK | Fence Foot — Concrete Block 32kg concrete block foot, for wind-exposed and coastal runs | 584 | — | Good | 584 |
| CLP-STD | Fence Clamp — Standard Galvanised panel clamp, 17mm bolt | 525 | — | Good | 525 |
| BW-COIL | Barbed Wire Coil — 100m Three-strand barbed topping, 100m coil, brackets included | 8 | — | Good | 8 |
| SIGN-SITE | Site Safety Sign 600 × 450 site safety sign, cable-tied to the run | 13 | — | Good | 13 |
| BIN-3 | Containment Bin — 3m³ 3m³ rubbish containment bin, lidded, hook-lift compatible | 3 | — | Good | 3 |
| Fence, metres | 1,186 m | — | 1,186 m | ||
Crew signature
Site signature
Date
All Fence U Rent Pty Ltd · ABN 24 128 604 973 · 80 Collingwood St, Osborne Park WA 6017 · 0408 877 300. The quantities on this docket are what gets invoiced. Equipment remains the property of All Fence U Rent Pty Ltd for the duration of the hire; anything not returned is charged at the replacement rate.
What this visit changes
Posted on 04 Aug 2026, 8:31 am. It put 1,186 m out and brought nothing back, which is why J-26-0126 now shows 1,186 m on site.
- Movements posted
- 8
- Yard adjusted
- 8 lines
- Docket
- D40274
The rest of this job
Open → SV-26-0405 Install 03 Aug 2026 SV-26-0465 Add 09 Aug 2026 SV-26-0469 Collect 09 Aug 2026 SV-26-0473 Repair 10 Aug 2026 SV-26-0477 Collect 11 Aug 2026 SV-26-0481 Collect 12 Aug 2026 SV-26-0485 Add 13 Aug 2026 SV-26-0489 Add 16 Aug 2026 SV-26-0493 Inspection 17 Aug 2026 SV-26-0497 Add 23 Aug 2026 SV-26-0501 Add 30 Aug 2026