All Fence
All Fence U Rent
SV-26-0444 Demo Final collection · Iron Bridge — Village Extension
Xero · synced 9:14 am 08 Aug 2026

SV-26-0444

Final collection Completed No charge

Visit 3 of 3 on J-26-0145 · Iron Bridge — Village Extension, Port Hedland

All Fence U Rent
All Fence U Rent Pty Ltd · ABN 24 128 604 973
80 Collingwood St, Osborne Park WA 6017
0408 877 300 · hire@allfenceurent.com.au
100% WA owned and operated
Final collection docket
SV-26-0444
08 June 2026
Docket D40416
Site
Iron Bridge — Village Extension
Woodstock Rd
Port Hedland WA 6721
Site contact Josh Tinetti · 0451 220 884
Customer
NRW Contracting Pty Ltd
ABN 38 118 293 138
Bianca Sheridan
08 9232 4200
Job
J-26-0145
Crew
CREW-5Luke
Truck
1JBQ 155
Completed
09 June 2026, 1:18 pm
ItemDescriptionOut to siteBack to yardConditionOn site after
TF-BRC Temporary Fence — Standard Braced
2.4m × 1.8m panel with bracing stay and second foot every third panel
916.8 m Good 0 m
SC-BLOK Total Block Out Screening
Solid block-out screening, 1.8m, wind-slit at 1.2m centres
574 m Good 0 m
SC-BLOK Total Block Out Screening
Solid block-out screening, 1.8m, wind-slit at 1.2m centres
12 m Lost 0 m
BRC-KIT Bracing Kit
Stay, second foot and two clamps, made up in the yard
126 Good 0
BRC-KIT Bracing Kit
Stay, second foot and two clamps, made up in the yard
3 Lost 0
FT-BLOK Fence Foot — Concrete Block
32kg concrete block foot, for wind-exposed and coastal runs
564 Good 0
FT-BLOK Fence Foot — Concrete Block
32kg concrete block foot, for wind-exposed and coastal runs
12 Lost 0
CLP-STD Fence Clamp — Standard
Galvanised panel clamp, 17mm bolt
547 Good 0
CLP-STD Fence Clamp — Standard
Galvanised panel clamp, 17mm bolt
17 Damaged 0
BW-COIL Barbed Wire Coil — 100m
Three-strand barbed topping, 100m coil, brackets included
9 Good 0
SIGN-SITE Site Safety Sign
600 × 450 site safety sign, cable-tied to the run
11 Good 0
SIGN-SITE Site Safety Sign
600 × 450 site safety sign, cable-tied to the run
1 Damaged 0
SIGN-SITE Site Safety Sign
600 × 450 site safety sign, cable-tied to the run
1 Lost 0
BIN-3 Containment Bin — 3m³
3m³ rubbish containment bin, lidded, hook-lift compatible
2 Good 0
BIN-3 Containment Bin — 3m³
3m³ rubbish containment bin, lidded, hook-lift compatible
1 Damaged 0
BIN-3 Containment Bin — 3m³
3m³ rubbish containment bin, lidded, hook-lift compatible
1 Lost 0
Fence, metres 1,503 m 0 m

Notes: Final collection — billed on the install invoice

Crew signature
Site signature
Date

All Fence U Rent Pty Ltd · ABN 24 128 604 973 · 80 Collingwood St, Osborne Park WA 6017 · 0408 877 300. The quantities on this docket are what gets invoiced. Equipment remains the property of All Fence U Rent Pty Ltd for the duration of the hire; anything not returned is charged at the replacement rate.

What this visit changes

Posted on 09 June 2026, 1:18 pm. It put nothing out and brought 1,503 m back, which is why J-26-0145 now shows 0 m on site.

Movements posted
16
Yard adjusted
16 lines
Docket
D40416

Came back short or damaged

Total Block Out Screening
12 m · $38.00 each
Lost $456.00
Bracing Kit
3 · $52.00 each
Lost $156.00
Fence Foot — Concrete Block
12 · $42.00 each
Lost $504.00
Fence Clamp — Standard
17 · $3.00 each
Damaged $51.00
Site Safety Sign
1 · $8.00 each
Damaged $8.00
Site Safety Sign
1 · $26.00 each
Lost $26.00
Containment Bin — 3m³
1 · $180.00 each
Damaged $180.00
Containment Bin — 3m³
1 · $1,680.00 each
Lost $1,680.00

Charged on a damage and loss invoice once the yard has assessed it, off the job.