the sum of every completed movement on this job — not the estimate, not the load 492 m · 612 units
ItemEstimatedLoadedInstalled Since installOn site nowHire /block
TF-BRC
Temporary Fence — Standard Braced
319.2 m 403.2 m 372 m +120 m 492 m $2.35
BRC-KIT
Bracing Kit
43 56 51 +5 56 —
FT-PLAS
Fence Foot — Plastic Filled
289 318 273 — 273 —
CLP-STD
Fence Clamp — Standard
274 304 271 — 271 —
SIGN-SITE
Site Safety Sign
6 8 7 — 7 $4.50
GT-PED
Pedestrian Gate Panel
3 4 3 — 3 $14.50
GT-VEH
Vehicle Gate — 6m Double Swing
1 2 2 — 2 $48.00
Fence, metres 319 m 403 m 372 m +120 m 492 m

They asked for 319 m, the yard sent 403 m so the crew would not run short, and 372 m went in. The install invoice bills the installed figure — $4,916.80 ex GST, against $4,141.78 had it been billed on the estimate (+$775).

How it got there

2 completed visits since 03 July 2026.

The hire

Booked
22 June 2026
Installed
03 July 2026
Agreed period
3 blocks · 12 weeks
Off hire due
25 Sept 20262 days ago
Site contact
Marcus Devereux
0419 003 552
Their PO
PO-412039
Booked by
JH

Site visits

every trip a crew has made or is booked to make — each one moves the running total
VisitTypeDateCrewStatusWhat movedNet metresInvoice
SV-26-0399
docket D40239
Install 03 July 2026
AM
CREW-4 Completed
+372 m TF-BRC +51 BRC-KIT +273 FT-PLAS +271 CLP-STD +3
+372 m INV-26-1018
SV-26-0400
docket D40240
Add 22 July 2026
AM
CREW-5 Completed
+120 m TF-BRC +5 BRC-KIT
+120 m INV-26-1019
SV-26-0467
docket D41880
Add 14 Aug 2026
AM
CREW-1 On site
+122.4 m TF-BRC +10 BRC-KIT
+122.4 m —
SV-26-0489 Collect 19 Aug 2026
PM
CREW-3 Scheduled
−177.6 m TF-BRC −8 BRC-KIT −73 FT-PLAS
−177.6 m —

2 visits still open.

Invoices raised on this job

Account customer — invoiced on 30 days EOM
InvoiceWhat forIssuedPeriodStatusEx GST
INV-26-1018 Install 03 July 2026 3 July – 25 Sept Overdue $5,605.55
INV-26-1019 Variation 22 July 2026 22 July – 25 Sept Sent $1,211.00
Billed on this job · $0.00 of it paid $6,816.55

Customer

BGC Construction Pty Ltd
Account 30 days EOM
Contact
Rhys Cattalini
Phone
08 9261 4200
ABN
59 008 924 353
Segment
Building & construction

Account customer, so this job is invoiced once the install is done and falls due on 30 days eom.

Purchase order required on every job. No PO, no dispatch.

Photos and paperwork

4 photos off the crews' iPads, and every docket raised against this site
After
After SV-26-0467
Finished run
14 Aug 2026, 6:00 pm
Before
Before SV-26-0467
Before we started
14 Aug 2026, 2:29 pm
After
After SV-26-0399
Completed run, gate at the west end
03 July 2026, 6:55 pm
Before
Before SV-26-0399
Frontage before we started
03 July 2026, 2:41 pm
DocketVisitWhenCrewSigned on site byState
D40239 SV-26-0399 Install 03 July 2026 CREW-4 Marcus Devereux Approved
D40240 SV-26-0400 Add 22 July 2026 CREW-5 Marcus Devereux Approved
D41880 SV-26-0467 Add 14 Aug 2026 CREW-1 Marcus Devereux Submitted
— SV-26-0489 Collect 19 Aug 2026 CREW-3 — Not started

Everything here is held with the job, not in a folder somewhere — so it is still attached to this site in two years when somebody asks what the frontage looked like before the crew started.

Conversation on this job

1 message — everything said about this, in one place
  1. In Phone Extra run needed 09 Aug 2026, 7:25 pm
    Marcus Devereux → us

    Gate access has moved to the southern end from Monday — passed to the crew.

Anything outbound also lands in Sent Items.