J-26-0130
On site Continuation of hireInnaloo Primary School — New Block · Ellen Stirling Blvd, Innaloo 6018 · Standard Braced · Building & construction
On site right now
the sum of every completed movement on this job — not the estimate, not the load 312 m · 469 units| Item | Estimated | Loaded | Installed | Since install | On site now | Hire /block |
|---|---|---|---|---|---|---|
| TF-BRC Temporary Fence — Standard Braced | 244.8 m | 343.2 m | 297.6 m | +14.4 m | 312 m | $2.35 |
| BRC-KIT Bracing Kit | 33 | 38 | 36 | +13 | 49 | — |
| FT-PLAS Fence Foot — Plastic Filled | 223 | 243 | 217 | −18 | 199 | — |
| CLP-STD Fence Clamp — Standard | 212 | 225 | 211 | — | 211 | — |
| SIGN-SITE Site Safety Sign | 4 | 6 | 5 | — | 5 | $4.50 |
| GT-PED Pedestrian Gate Panel | 2 | 3 | 3 | — | 3 | $14.50 |
| GT-VEH Vehicle Gate — 6m Double Swing | 1 | 2 | 2 | — | 2 | $48.00 |
| Fence, metres | 245 m | 343 m | 298 m | +14.4 m | 312 m |
They asked for 245 m, the yard sent 343 m so the crew would not run short, and 298 m went in. The install invoice bills the installed figure — $4,078.84 ex GST, against $3,245.32 had it been billed on the estimate (+$834).
How it got there
4 completed visits since 17 June 2026.
The hire
- Booked
- 26 May 2026
- Installed
- 17 June 2026
- Agreed period
- 3 blocks · 12 weeks
- Off hire due
- 09 Sept 202618 days ago
- Site contact
- Josh Tinetti0451 220 884
- Their PO
- FIRM-21084
- Booked by
- KD
Continuation of hire
past 09 Sept 2026 by 1 block · 4 weeks — charged per metre, per four-week block, on what is on site now| Item | On site | Rate | Per block | × 1 |
|---|---|---|---|---|
| GT-PED Pedestrian Gate Panel | 3 | $14.50 / unit / month | $43.50 | $43.50 |
| GT-VEH Vehicle Gate — 6m Double Swing | 2 | $48.00 / unit / month | $96.00 | $96.00 |
| SIGN-SITE Site Safety Sign | 5 | $4.50 / unit / month | $22.50 | $22.50 |
| TF-BRC Temporary Fence — Standard Braced | 312 m | $2.35 / m / month | $733.20 | $733.20 |
| Accrued and not yet raised | $895.20 | $895.20 | ||
Site visits
every trip a crew has made or is booked to make — each one moves the running total| Visit | Type | Date | Crew | Status | What moved | Net metres | Invoice |
|---|---|---|---|---|---|---|---|
| SV-26-0413 docket D40302 | Install | 17 June 2026 All day | CREW-3 | Completed | +297.6 m TF-BRC +36 BRC-KIT +217 FT-PLAS +211 CLP-STD +3 | +297.6 m | INV-26-1032 |
| SV-26-0414 docket D40303 | Add | 06 July 2026 PM | CREW-4 | Completed | +103.2 m TF-BRC +14 BRC-KIT +75 FT-PLAS | +103.2 m | INV-26-1033 |
| SV-26-0415 docket D40304 | Collect | 23 July 2026 AM | CREW-5 | Completed | −124.8 m TF-BRC −11 BRC-KIT −93 FT-PLAS | −124.8 m | INV-26-1034 |
| SV-26-0416 docket D40305 | Add | 05 Aug 2026 AM | CREW-1 | Completed | +36 m TF-BRC +10 BRC-KIT | +36 m | |
| SV-26-0482 | Add | 17 Aug 2026 PM | CREW-1 | Scheduled | +79.2 m TF-BRC | +79.2 m | — |
| SV-26-0504 | Add | 03 Sept 2026 AM | CREW-3 | Scheduled | +117.6 m TF-BRC | +117.6 m | — |
2 visits still open.
Invoices raised on this job
Account customer — invoiced on 30 days EOM| Invoice | What for | Issued | Period | Status | Ex GST |
|---|---|---|---|---|---|
| INV-26-1032 | Install | 17 June 2026 | 17 June – 9 Sept | Paid | $4,078.84 |
| INV-26-1033 | Variation | 06 July 2026 | 6 July – 9 Sept | Sent | $1,067.36 |
| INV-26-1034 | Variation | 23 July 2026 | 23 July – — | Paid | $470.00 |
| Billed on this job · $4,548.84 of it paid | $5,616.20 | ||||
Not yet raised:
Customer
Firm Construction Pty Ltd
Account 30 days EOM
- Contact
- Anita Doulis
- Phone
- 08 9382 4800
- ABN
- 70 129 054 787
- Segment
- Building & construction
Account customer, so this job is invoiced once the install is done and falls due on 30 days eom.
Log a site visit
What the crew took out, or what came back. Completing it posts the movements and the running total, the yard and the continuation rate all follow.
Edit J-26-0130
Site details and the agreed hire period.
Photos and paperwork
nothing filed against this site yet| Docket | Visit | When | Crew | Signed on site by | State | |
|---|---|---|---|---|---|---|
| D40302 | SV-26-0413 Install | 17 June 2026 | CREW-3 | Josh Tinetti | Approved | |
| D40303 | SV-26-0414 Add | 06 July 2026 | CREW-4 | Josh Tinetti | Approved | |
| D40304 | SV-26-0415 Collect | 23 July 2026 | CREW-5 | Josh Tinetti | Approved | |
| D40305 | SV-26-0416 Add | 05 Aug 2026 | CREW-1 | Josh Tinetti | Approved | |
| — | SV-26-0482 Add | 17 Aug 2026 | CREW-1 | — | Not started | |
| — | SV-26-0504 Add | 03 Sept 2026 | CREW-3 | — | Not started |