J-26-0130
On siteInnaloo Primary School — New Block · Ellen Stirling Blvd, Innaloo 6018 · Standard Braced · Building & construction
On site right now
the sum of every completed movement on this job — not the estimate, not the load 211 m · 339 units| Item | Estimated | Loaded | Installed | Since install | On site now | Hire /mo |
|---|---|---|---|---|---|---|
| TF-BRC Temporary Fence — Standard Braced | 163.2 m | 199.2 m | 194.4 m | +16.8 m | 211.2 m | $2.35 |
| BRC-KIT Bracing Kit | 22 | 26 | 24 | — | 24 | — |
| FT-PLAS Fence Foot — Plastic Filled | 148 | 166 | 145 | +16 | 161 | — |
| CLP-STD Fence Clamp — Standard | 140 | 174 | 147 | — | 147 | — |
| SIGN-SITE Site Safety Sign | 3 | 4 | 3 | — | 3 | $4.50 |
| GT-PED Pedestrian Gate Panel | 1 | 2 | 2 | — | 2 | $14.50 |
| GT-VEH Vehicle Gate — 6m Double Swing | 1 | 2 | 2 | — | 2 | $48.00 |
| Fence, metres | 163 m | 199 m | 194 m | +16.8 m | 211 m |
They asked for 163 m, the yard sent 199 m so the crew would not run short, and 194 m went in. The install invoice bills the installed figure — $2,868.46 ex GST, against $2,283.88 had it been billed on the estimate (+$585).
How it got there
4 completed visits since 11 June 2026.
The hire
- Booked
- 27 May 2026
- Installed
- 11 June 2026
- Agreed period
- 3 months
- Off hire due
- 11 Sept 2026in 34 days
- Site contact
- Josh Tinetti0451 220 884
- Their PO
- FIRM-21084
- Booked by
- MC
Site visits
every trip a crew has made or is booked to make — each one moves the running total| Visit | Type | Date | Crew | Status | What moved | Net metres | Invoice |
|---|---|---|---|---|---|---|---|
| SV-26-0413 docket D40302 | Install | 11 June 2026 AM | CREW-3 | Completed | +194.4 m TF-BRC +24 BRC-KIT +145 FT-PLAS +147 CLP-STD +3 | +194.4 m | INV-26-1029 |
| SV-26-0414 docket D40303 | Collect | 22 June 2026 PM | CREW-4 | Completed | −76.8 m TF-BRC −9 BRC-KIT | −76.8 m | INV-26-1031 |
| SV-26-0415 docket D40304 | Add | 06 July 2026 PM | CREW-5 | Completed | +40.8 m TF-BRC +5 BRC-KIT +16 FT-PLAS | +40.8 m | INV-26-1030 |
| SV-26-0416 docket D40305 | Add | 23 July 2026 AM | CREW-1 | Completed | +52.8 m TF-BRC +4 BRC-KIT | +52.8 m |
Invoices raised on this job
Account customer — invoiced on 30 days EOM| Invoice | What for | Issued | Period | Status | Ex GST |
|---|---|---|---|---|---|
| INV-26-1029 | Install | 11 June 2026 | 11 June – 11 Sept | Overdue | $2,868.46 |
| INV-26-1031 | Variation | 22 June 2026 | 22 June – — | Paid | $185.00 |
| INV-26-1030 | Variation | 06 July 2026 | 6 July – 11 Sept | Sent | $533.84 |
| Billed on this job · $185.00 of it paid | $3,587.30 | ||||
Not yet raised:
Customer
Firm Construction Pty Ltd
Account 30 days EOM
- Contact
- Anita Doulis
- Phone
- 08 9382 4800
- ABN
- 70 129 054 787
- Segment
- Building & construction
Account customer, so this job is invoiced once the install is done and falls due on 30 days eom.
Log a site visit
What the crew took out, or what came back. Completing it posts the movements and the running total, the yard and the continuation rate all follow.
Edit J-26-0130
Site details and the agreed hire period.