All Fence
All Fence U Rent
J-26-0133 Demo Wangara Industrial — Lot 62 · Wangara
Xero · synced 9:14 am 27 Sept 2026

J-26-0133

On site

Wangara Industrial — Lot 62 · 62 Distinction Rd, Wangara 6065 · Standard Braced · Building & construction

On site right now

the sum of every completed movement on this job — not the estimate, not the load 252 m · 359 units
ItemEstimatedLoadedInstalled Since installOn site nowHire /block
TF-BRC
Temporary Fence — Standard Braced
180 m 252 m 218.4 m +33.6 m 252 m $2.35
BRC-KIT
Bracing Kit
25 30 28 +9 37 —
FT-PLAS
Fence Foot — Plastic Filled
164 187 164 — 164 —
CLP-STD
Fence Clamp — Standard
156 181 149 — 149 —
SIGN-SITE
Site Safety Sign
3 4 4 — 4 $4.50
GT-PED
Pedestrian Gate Panel
2 3 3 — 3 $14.50
GT-VEH
Vehicle Gate — 6m Double Swing
1 2 2 — 2 $48.00
Fence, metres 180 m 252 m 218 m +33.6 m 252 m

They asked for 180 m, the yard sent 252 m so the crew would not run short, and 218 m went in. The install invoice bills the installed figure — $3,202.06 ex GST, against $2,525.50 had it been billed on the estimate (+$677).

How it got there

2 completed visits since 20 July 2026.

The hire

Booked
01 July 2026
Installed
20 July 2026
Agreed period
3 blocks · 12 weeks
Off hire due
12 Oct 2026in 15 days
Site contact
Trent Hollows
0412 884 021
Their PO
DEVL-21105
Booked by
JH

Site visits

every trip a crew has made or is booked to make — each one moves the running total
VisitTypeDateCrewStatusWhat movedNet metresInvoice
SV-26-0421
docket D40323
Install 20 July 2026
PM
CREW-1 Completed
+218.4 m TF-BRC +28 BRC-KIT +164 FT-PLAS +149 CLP-STD +3
+218.4 m INV-26-1038
SV-26-0422
docket D40324
Add 03 Aug 2026
PM
CREW-2 Completed
+33.6 m TF-BRC +9 BRC-KIT
+33.6 m
SV-26-0487 Collect 19 Aug 2026
AM
CREW-1 Scheduled
−36 m TF-BRC
−36 m —

1 visit still open.

Invoices raised on this job

Account customer — invoiced on 30 days EOM
InvoiceWhat forIssuedPeriodStatusEx GST
INV-26-1038 Install 20 July 2026 20 July – 12 Oct Sent $3,392.06
Billed on this job · $0.00 of it paid $3,392.06
Not yet raised:

Customer

Devlyn Australia Pty Ltd
Account 30 days EOM
Contact
Marco Petruzzi
Phone
08 9209 3900
ABN
51 116 224 903
Segment
Building & construction

Account customer, so this job is invoiced once the install is done and falls due on 30 days eom.

Photos and paperwork

nothing filed against this site yet
DocketVisitWhenCrewSigned on site byState
D40323 SV-26-0421 Install 20 July 2026 CREW-1 Trent Hollows Approved
D40324 SV-26-0422 Add 03 Aug 2026 CREW-2 Trent Hollows Approved
— SV-26-0487 Collect 19 Aug 2026 CREW-1 — Not started