J-26-0134 Demo Belmont Apartments — Stage 1 · Belmont
Xero · synced 9:14 am 27 Sept 2026

J-26-0134

On site Continuation of hire Customer on hold

Belmont Apartments — Stage 1 · 18 Robinson Ave, Belmont 6104 · Standard Braced · Building & construction

On site right now

the sum of every completed movement on this job — not the estimate, not the load 370 m · 528 units
ItemEstimatedLoadedInstalled Since installOn site nowHire /block
TF-BRC
Temporary Fence — Standard Braced
247.2 m 331.2 m 295.2 m +74.4 m 369.6 m $2.35
BRC-KIT
Bracing Kit
34 38 37 +13 50 —
FT-PLAS
Fence Foot — Plastic Filled
225 262 230 — 230 —
CLP-STD
Fence Clamp — Standard
214 276 237 — 237 —
SIGN-SITE
Site Safety Sign
4 6 6 — 6 $4.50
GT-PED
Pedestrian Gate Panel
2 3 3 — 3 $14.50
GT-VEH
Vehicle Gate — 6m Double Swing
1 2 2 — 2 $48.00
Fence, metres 247 m 331 m 295 m +74.4 m 370 m

They asked for 247 m, the yard sent 331 m so the crew would not run short, and 295 m went in. The install invoice bills the installed figure — $4,066.18 ex GST, against $3,271.48 had it been billed on the estimate (+$795).

How it got there

2 completed visits since 27 Apr 2026.

The hire

Booked
16 Apr 2026
Installed
27 Apr 2026
Agreed period
3 blocks · 12 weeks
Off hire due
20 July 202669 days ago
Site contact
Kane Bartholomew
0413 550 118
Their PO
NRTH-21112
Booked by
MC

Continuation of hire

past 20 July 2026 by 3 blocks · 12 weeks — charged per metre, per four-week block, on what is on site now
ItemOn siteRatePer block× 3
GT-PED
Pedestrian Gate Panel
3 $14.50 / unit / month $43.50 $130.50
GT-VEH
Vehicle Gate — 6m Double Swing
2 $48.00 / unit / month $96.00 $288.00
SIGN-SITE
Site Safety Sign
6 $4.50 / unit / month $27.00 $81.00
TF-BRC
Temporary Fence — Standard Braced
369.6 m $2.35 / m / month $868.56 $2,605.68
Accrued and not yet raised $1,035.06 $3,105.18

Site visits

every trip a crew has made or is booked to make — each one moves the running total
VisitTypeDateCrewStatusWhat movedNet metresInvoice
SV-26-0423
docket D40330
Install 27 Apr 2026
AM
CREW-2 Completed
+295.2 m TF-BRC +37 BRC-KIT +230 FT-PLAS +237 CLP-STD +3
+295.2 m INV-26-1039
SV-26-0424
docket D40331
Add 22 June 2026
PM
CREW-3 Completed
+74.4 m TF-BRC +13 BRC-KIT
+74.4 m INV-26-1040
SV-26-0474 Inspection 17 Aug 2026
PM
CREW-3 Scheduled
+14.4 m TF-BRC
+14.4 m no charge
SV-26-0496 Inspection 24 Aug 2026
AM
CREW-5 Scheduled
+14.4 m TF-BRC
+14.4 m no charge

2 visits still open.

Invoices raised on this job

Account customer — invoiced on 30 days EOM
InvoiceWhat forIssuedPeriodStatusEx GST
INV-26-1039 Install 27 Apr 2026 27 Apr – 20 July Paid $4,066.18
INV-26-1040 Variation 22 June 2026 22 June – 20 July Overdue $646.28
Billed on this job · $4,066.18 of it paid $4,712.46

Customer

Northerly Group Pty Ltd
Account 30 days EOM On hold
Contact
Grant Wisbey
Phone
08 9328 7700
ABN
34 143 092 771
Segment
Building & construction

Account customer, so this job is invoiced once the install is done and falls due on 30 days eom.

On hold — $46,283 at 74 days. Vanessa to speak to Grant before any further dispatch.

Photos and paperwork

nothing filed against this site yet
DocketVisitWhenCrewSigned on site byState
D40330 SV-26-0423 Install 27 Apr 2026 CREW-2 Kane Bartholomew Approved
D40331 SV-26-0424 Add 22 June 2026 CREW-3 Kane Bartholomew Approved
— SV-26-0474 Inspection 17 Aug 2026 CREW-3 — Not started
— SV-26-0496 Inspection 24 Aug 2026 CREW-5 — Not started