J-26-0155
Awaiting approvalCannington — Albany Hwy childcare · 1284 Albany Hwy, Cannington 6107 · Standard Braced · Building & construction
On site right now
the sum of every completed movement on this job — not the estimate, not the load 0 m| Item | Estimated | Loaded | Installed | Since install | On site now | Hire /block |
|---|---|---|---|---|---|---|
| TF-BRC Temporary Fence — Standard Braced | 247.2 m | — | — | — | — | $2.35 |
| BRC-KIT Bracing Kit | 34 | — | — | — | — | — |
| FT-PLAS Fence Foot — Plastic Filled | 225 | — | — | — | — | — |
| CLP-STD Fence Clamp — Standard | 214 | — | — | — | — | — |
| SIGN-SITE Site Safety Sign | 5 | — | — | — | — | $4.50 |
| GT-PED Pedestrian Gate Panel | 2 | — | — | — | — | $14.50 |
| GT-VEH Vehicle Gate — 6m Double Swing | 1 | — | — | — | — | $48.00 |
| Fence, metres | 247 m | 0 m | 0 m | — | 0 m |
How it got there
0 completed visits since 11 Aug 2026.
The hire
- Booked
- 11 Aug 2026
- Install due
- 24 Aug 2026
- Agreed period
- 6 blocks · 24 weeks
- Off hire due
- ——
- Site contact
- Emma Sandover08 9420 8000
- Their PO
- PACT-21811
- Booked by
- DV
Site visits
every trip a crew has made or is booked to make — each one moves the running total| Visit | Type | Date | Crew | Status | What moved | Net metres | Invoice |
|---|
Invoices raised on this job
Account customer — invoiced on 30 days EOM| Invoice | What for | Issued | Period | Status | Ex GST |
|---|---|---|---|---|---|
| Nothing invoiced on this job yet. | |||||
Customer
PACT Construction Pty Ltd
Account 30 days EOM
- Contact
- Emma Sandover
- Phone
- 08 9420 8000
- ABN
- 89 099 042 559
- Segment
- Building & construction
Account customer, so this job is invoiced once the install is done and falls due on 30 days eom.
Log a site visit
What the crew took out, or what came back. Completing it posts the movements and the running total, the yard and the continuation rate all follow.
Edit J-26-0155
Site details and the agreed hire period.
Photos and paperwork
nothing filed against this site yet| Docket | Visit | When | Crew | Signed on site by | State |
|---|
Everything here is held with the job, not in a folder somewhere — so it is still attached to this site in two years when somebody asks what the frontage looked like before the crew started.
Conversation on this job
1 message — everything said about this, in one place- In Website form Accepted — Cannington — Albany Hwy childcare 12 Aug 2026, 10:45 pmEmma Sandover → us
Emma Sandover accepted the quote for Cannington — Albany Hwy childcare. Requested install date: 2026-08-24 Their note: Can you do the whole perimeter including the laneway side?
Anything outbound also lands in Sent Items.