Q-26-0134
ExpiredKwinana Refinery — Tank 402 Strip-out · Kwinana Beach · Combination of Fence Types · 2 blocks · 8 weeks hire
80 Collingwood St, Osborne Park WA 6017
0408 877 300 · hire@allfenceurent.com.au
100% WA owned and operated
59 Albany Hwy
Victoria Park WA 6100
ABN 28 008 988 547
Kwinana Beach WA
Combination of Fence Types
Hire period 2 blocks · 8 weeks
| Item | Qty | Hire · 2 blk | Install | Collection | Amount |
|---|---|---|---|---|---|
| Temporary Fence — Standard Braced TF-BRC · 2.4m × 1.8m panel with bracing stay and second foot every third panel | 297.6 m | $4.70 | $2.10 | $1.75 | $2,544.48 |
| Total Block Out Screening SC-BLOK · Solid block-out screening, 1.8m, wind-slit at 1.2m centres | 268 m | $3.50 | $1.55 | $1.10 | $1,648.20 |
| Bracing Kit BRC-KIT · Stay, second foot and two clamps, made up in the yard | 49 | — | — | — | $0.00 |
| Fence Foot — Concrete Block FT-BLOK · 32kg concrete block foot, for wind-exposed and coastal runs | 268 | — | — | — | $0.00 |
| Fence Clamp — Standard CLP-STD · Galvanised panel clamp, 17mm bolt | 254 | — | — | — | $0.00 |
| Barbed Wire Coil — 100m BW-COIL · Three-strand barbed topping, 100m coil, brackets included | 4 | $64.00 | $18.00 | $12.00 | $376.00 |
| Site Safety Sign SIGN-SITE · 600 × 450 site safety sign, cable-tied to the run | 6 | $9.00 | — | — | $54.00 |
| Containment Bin — 3m³ BIN-3 · 3m³ rubbish containment bin, lidded, hook-lift compatible | 1 | $190.00 | $45.00 | $45.00 | $280.00 |
| Delivery & cartage | $680.00 | ||||
- Hire, 2 blocks · 8 weeks
- $2,836.72
- Install
- $1,157.36
- Final collection
- $908.60
- Delivery & cartage
- $680.00
- Subtotal ex GST
- $5,582.68
- GST 10%
- $558.27
- Total
- $6,140.95
The final collection is included above. If nothing changes on site, the quoted amount covers the job from delivery through to the day the equipment comes back.
Continuation of hire. If the job runs past 2 blocks · 8 weeks, hire continues at $1,418.36 per four-week block on the equipment still on site — charged per metre, per block, on whatever the running total is at the time, not on the quantity quoted here.
Adding or removing equipment. A crew returning to site during the hire is charged a callout, plus install, the balance of the hire and collection on anything added.
Equipment remains the property of All Fence U Rent Pty Ltd throughout. Anything not returned, or returned damaged, is charged at the rates in our hire terms. Payment terms 45 days EOM.
Quoted by AL · 0408 877 300 · hire@allfenceurent.com.au
What this quote is worth
- Metres of fence
- 566 m
- Lines
- 8
- Hire period
- 2 blocks · 8 weeks
- Then, per block
- $1,418.36
- Valid until
- 05 Sept 2026
Where it came from, where it went
Customer
Invoiced once the install is done, falling due on 45 days eom.
“If they need changes you can still go in and edit it and change it and then send it back rather than having multiple quote numbers.”
Conversation on this quote
2 messages — everything said about this, in one place- In Email RE: Quote Q-26-0134 — Kwinana Refinery — Tank 402 Strip-out 08 Aug 2026, 7:36 pmDean Kowalczyk → us
Can you split the frontage and the laydown area onto separate lines so we can code them differently?
- Out Email Quote Q-26-0134 — Kwinana Refinery — Tank 402 Strip-out 06 Aug 2026, 5:43 pmKeshia Dorrington, All Fence U Rent Pty Ltd → Dean Kowalczyk
Hi Dean, Thanks for the enquiry. Quote Q-26-0134 is attached for Kwinana Refinery — Tank 402 Strip-out, Kwinana Beach. It includes delivery, install and the final collection, so if nothing changes on site there is nothing further to pay. Keshia Dorrington Rental Manager · All Fence U Rent Pty Ltd