INV-26-1028
Continuation of hire Overdue Xero INV-9022PACT Construction Pty Ltd · J-26-0128 Joondalup Health Campus Car Park
All Fence U Rent Pty Ltd · ABN 24 128 604 973
80 Collingwood St, Osborne Park WA 6017
0408 877 300 · hire@allfenceurent.com.au
100% WA owned and operated
80 Collingwood St, Osborne Park WA 6017
0408 877 300 · hire@allfenceurent.com.au
100% WA owned and operated
Tax invoice
INV-26-1028
03 Aug 2026
Period 06 July 2026 – 03 Aug 2026
Invoice to
PACT Construction Pty Ltd
Emma Sandover
18 Sangiorgio Ct
Osborne Park WA 6017
ABN 89 099 042 559
18 Sangiorgio Ct
Osborne Park WA 6017
ABN 89 099 042 559
Site
Joondalup Health Campus Car Park
Grand Blvd
Joondalup WA 6027
Job J-26-0128 · your PO Not provided
Standard Braced
Joondalup WA 6027
Job J-26-0128 · your PO Not provided
Standard Braced
Issued
03 Aug 2026
Terms
30 days EOM
Due
01 Sept 2026
Status
26 days ago
Continuation
Per metre, per four-week block, on the equipment standing on site — not on what was quoted. $663.96| Description | Qty | Unit | Amount |
|---|---|---|---|
| Continuation of hire — Temporary Fence — Standard Braced · per metre, per four-week blockTF-BRC | 213.6 m | $2.35 | $501.96 |
| Continuation of hire — Site Safety Sign · per unit, per four-week blockSIGN-SITE | 5 | $4.50 | $22.50 |
| Continuation of hire — Pedestrian Gate Panel · per unit, per four-week blockGT-PED | 3 | $14.50 | $43.50 |
| Continuation of hire — Vehicle Gate — 6m Double Swing · per unit, per four-week blockGT-VEH | 2 | $48.00 | $96.00 |
- Subtotal ex GST
- $663.96
- GST 10%
- $66.40
- Total due
- $730.36
Payment
NAB · BSB 086-006 · Account 44 921 8807
All Fence U Rent Pty Ltd
Please quote INV-26-1028 as the reference.
All Fence U Rent Pty Ltd
Please quote INV-26-1028 as the reference.
Notes
Hire continued past the agreed period · checked and approved before it went out
All Fence U Rent Pty Ltd · ABN 24 128 604 973 · 80 Collingwood St, Osborne Park WA 6017 · 0408 877 300 · hire@allfenceurent.com.au
Amount
$730.36
$663.96 ex GST + $66.40 GST
- Kind
- Continuation of hire
- Lines
- 4
- Terms
- 30 days EOM
- Xero
- INV-9022
Why this is the amount
The agreed period ended 06 July 2026 and the equipment is still on site. This is the per-metre-per-block rate applied to what was standing there over 06 July 2026 – 03 Aug 2026 — the running total, not the original quantity.
See the running total →