J-26-0128
On site Continuation of hireJoondalup Health Campus Car Park · Grand Blvd, Joondalup 6027 · Standard Braced · Building & construction
On site right now
the sum of every completed movement on this job — not the estimate, not the load 214 m · 373 units| Item | Estimated | Loaded | Installed | Since install | On site now | Hire /block |
|---|---|---|---|---|---|---|
| TF-BRC Temporary Fence — Standard Braced | 206.4 m | 252 m | 225.6 m | −12 m | 213.6 m | $2.35 |
| BRC-KIT Bracing Kit | 28 | 36 | 30 | −5 | 25 | — |
| FT-PLAS Fence Foot — Plastic Filled | 187 | 224 | 209 | −77 | 132 | — |
| CLP-STD Fence Clamp — Standard | 178 | 211 | 206 | — | 206 | — |
| SIGN-SITE Site Safety Sign | 4 | 5 | 5 | — | 5 | $4.50 |
| GT-PED Pedestrian Gate Panel | 2 | 3 | 3 | — | 3 | $14.50 |
| GT-VEH Vehicle Gate — 6m Double Swing | 1 | 2 | 2 | — | 2 | $48.00 |
| Fence, metres | 206 m | 252 m | 226 m | −12 m | 214 m |
They asked for 206 m, the yard sent 252 m so the crew would not run short, and 226 m went in. The install invoice bills the installed figure — $3,986.20 ex GST, against $3,406.80 had it been billed on the estimate (+$579).
How it got there
4 completed visits since 16 Mar 2026.
The hire
- Booked
- 25 Feb 2026
- Installed
- 16 Mar 2026
- Agreed period
- 4 blocks · 16 weeks
- Off hire due
- 06 July 202683 days ago
- Continuation billed to
- 03 Aug 2026
- Site contact
- Wes Malinauskas0447 118 226
- Their PO
- Not provided
- Booked by
- DV
Continuation of hire
past 06 July 2026 by 2 blocks · 8 weeks — charged per metre, per four-week block, on what is on site now| Item | On site | Rate | Per block | × 2 |
|---|---|---|---|---|
| GT-PED Pedestrian Gate Panel | 3 | $14.50 / unit / month | $43.50 | $87.00 |
| GT-VEH Vehicle Gate — 6m Double Swing | 2 | $48.00 / unit / month | $96.00 | $192.00 |
| SIGN-SITE Site Safety Sign | 5 | $4.50 / unit / month | $22.50 | $45.00 |
| TF-BRC Temporary Fence — Standard Braced | 213.6 m | $2.35 / m / month | $501.96 | $1,003.92 |
| Accrued and not yet raised | $663.96 | $1,327.92 | ||
Site visits
every trip a crew has made or is booked to make — each one moves the running total| Visit | Type | Date | Crew | Status | What moved | Net metres | Invoice |
|---|---|---|---|---|---|---|---|
| SV-26-0407 docket D40288 | Install | 16 Mar 2026 PM | CREW-1 | Completed | +225.6 m TF-BRC +30 BRC-KIT +209 FT-PLAS +206 CLP-STD +3 | +225.6 m | INV-26-1024 |
| SV-26-0408 docket D40289 | Add | 27 Mar 2026 AM | CREW-2 | Completed | +28.8 m TF-BRC +4 BRC-KIT | +28.8 m | INV-26-1025 |
| SV-26-0409 docket D40290 | Add | 24 Apr 2026 PM | CREW-3 | Completed | +62.4 m TF-BRC | +62.4 m | INV-26-1026 |
| SV-26-0410 docket D40291 | Collect | 21 May 2026 PM | CREW-4 | Completed | −103.2 m TF-BRC −9 BRC-KIT −77 FT-PLAS | −103.2 m | INV-26-1027 |
| SV-26-0486 | Add | 18 Aug 2026 PM | CREW-5 | Scheduled | +52.8 m TF-BRC | +52.8 m | — |
1 visit still open.
Invoices raised on this job
Account customer — invoiced on 30 days EOM| Invoice | What for | Issued | Period | Status | Ex GST |
|---|---|---|---|---|---|
| INV-26-1024 | Install | 16 Mar 2026 | 16 Mar – 6 July | Paid | $3,986.20 |
| INV-26-1025 | Variation | 27 Mar 2026 | 27 Mar – 6 July | Paid | $590.35 |
| INV-26-1026 | Variation | 24 Apr 2026 | 24 Apr – 6 July | Paid | $865.16 |
| INV-26-1027 | Variation | 21 May 2026 | 21 May – — | Paid | $185.00 |
| INV-26-1028 | Continuation of hire | 03 Aug 2026 | 6 July – 3 Aug | Sent | $663.96 |
| INV-26-1079 | Continuation of hire | 14 Aug 2026 | 3 Aug – 31 Aug | Draft | $663.96 |
| Billed on this job · $5,626.71 of it paid | $6,954.63 | ||||
Customer
PACT Construction Pty Ltd
Account 30 days EOM
- Contact
- Emma Sandover
- Phone
- 08 9420 8000
- ABN
- 89 099 042 559
- Segment
- Building & construction
Account customer, so this job is invoiced once the install is done and falls due on 30 days eom.
Log a site visit
What the crew took out, or what came back. Completing it posts the movements and the running total, the yard and the continuation rate all follow.
Edit J-26-0128
Site details and the agreed hire period.
Photos and paperwork
2 photos off the crews' iPads, and every docket raised against this site After
After SV-26-0407
Completed run, gate at the west end
16 Mar 2026, 6:01 pm
Before
Before SV-26-0407
Frontage before we started
16 Mar 2026, 4:20 pm
| Docket | Visit | When | Crew | Signed on site by | State | |
|---|---|---|---|---|---|---|
| D40288 | SV-26-0407 Install | 16 Mar 2026 | CREW-1 | Wes Malinauskas | Approved | |
| D40289 | SV-26-0408 Add | 27 Mar 2026 | CREW-2 | Wes Malinauskas | Approved | |
| D40290 | SV-26-0409 Add | 24 Apr 2026 | CREW-3 | Wes Malinauskas | Approved | |
| D40291 | SV-26-0410 Collect | 21 May 2026 | CREW-4 | Wes Malinauskas | Approved | |
| — | SV-26-0486 Add | 18 Aug 2026 | CREW-5 | — | Not started |
Everything here is held with the job, not in a folder somewhere — so it is still attached to this site in two years when somebody asks what the frontage looked like before the crew started.
Conversation on this job
nothing logged against this yet Anything outbound also lands in Sent Items.