INV-26-1049
Continuation of hire Paid Xero INV-9043NRW Contracting Pty Ltd · J-26-0145 Iron Bridge — Village Extension
All Fence U Rent Pty Ltd · ABN 24 128 604 973
80 Collingwood St, Osborne Park WA 6017
0408 877 300 · hire@allfenceurent.com.au
100% WA owned and operated
80 Collingwood St, Osborne Park WA 6017
0408 877 300 · hire@allfenceurent.com.au
100% WA owned and operated
Tax invoice
INV-26-1049
25 May 2026
Period 25 Apr 2026 – 25 May 2026
Invoice to
NRW Contracting Pty Ltd
Bianca Sheridan
181 Great Eastern Hwy
Belmont WA 6104
ABN 38 118 293 138
181 Great Eastern Hwy
Belmont WA 6104
ABN 38 118 293 138
Site
Iron Bridge — Village Extension
Woodstock Rd
Port Hedland WA 6721
Job J-26-0145
Combination of Fence Types
Port Hedland WA 6721
Job J-26-0145
Combination of Fence Types
Issued
25 May 2026
Terms
45 days EOM
Due
31 May 2026
Status
Paid 02 July 2026
Continuation
Per metre, per month, on the equipment standing on site — not on what was quoted. $3,906.48| Description | Qty | Unit | Amount |
|---|---|---|---|
| Continuation of hire — Temporary Fence — Standard Braced · per metre, per monthTF-BRC | 916.8 m | $2.35 | $2,154.48 |
| Continuation of hire — Total Block Out Screening · per metre, per monthSC-BLOK | 586 m | $1.75 | $1,025.50 |
| Continuation of hire — Barbed Wire Coil — 100m · per unit, per monthBW-COIL | 9 | $32.00 | $288.00 |
| Continuation of hire — Site Safety Sign · per unit, per monthSIGN-SITE | 13 | $4.50 | $58.50 |
| Continuation of hire — Containment Bin — 3m³ · per unit, per monthBIN-3 | 4 | $95.00 | $380.00 |
- Subtotal ex GST
- $3,906.48
- GST 10%
- $390.65
- Total due
- $4,297.13
- Paid 02 July 2026
- $4,297.13
Payment
NAB · BSB 086-006 · Account 44 921 8807
All Fence U Rent Pty Ltd
Please quote INV-26-1049 as the reference.
All Fence U Rent Pty Ltd
Please quote INV-26-1049 as the reference.
Notes
Hire continued past the agreed period
All Fence U Rent Pty Ltd · ABN 24 128 604 973 · 80 Collingwood St, Osborne Park WA 6017 · 0408 877 300 · hire@allfenceurent.com.au
Amount
$4,297.13
$3,906.48 ex GST + $390.65 GST
- Kind
- Continuation of hire
- Lines
- 5
- Terms
- 45 days EOM
- Xero
- INV-9043
Why this is the amount
The agreed period ended 25 Apr 2026 and the equipment is still on site. This is the per-metre-per-month rate applied to what was standing there over 25 Apr 2026 – 25 May 2026 — the running total, not the original quantity.
See the running total →