All Fence
All Fence U Rent
INV-26-1077 Demo Continuation of hire · Georgiou Group Pty Ltd
Xero · synced 9:14 am 14 Aug 2026

INV-26-1077

Continuation of hire Draft Xero INV-9071

Georgiou Group Pty Ltd · J-26-0118 Stirling Highway Duplication — Stage 2

All Fence U Rent
All Fence U Rent Pty Ltd · ABN 24 128 604 973
80 Collingwood St, Osborne Park WA 6017
0408 877 300 · hire@allfenceurent.com.au
100% WA owned and operated
Tax invoice
INV-26-1077
14 Aug 2026
Period 03 Aug 2026 – 31 Aug 2026
Invoice to
Georgiou Group Pty Ltd
Dane Mitchelson
68 Hasler Rd
Osborne Park WA 6017
ABN 88 009 253 202
Site
Stirling Highway Duplication — Stage 2
Stirling Hwy at Broadway
Nedlands WA 6009
Job J-26-0118 · your PO GEOR-21000
Standard Braced with Total Block Out
Issued
14 Aug 2026
Terms
30 days EOM
Due
01 Sept 2026
Status
Draft

Continuation

Per metre, per four-week block, on the equipment standing on site — not on what was quoted. $1,834.24
DescriptionQtyUnitAmount
Continuation of hire — Temporary Fence — Standard Braced · per metre, per four-week block × 1TF-BRC 518.4 m $2.35 $1,218.24
Continuation of hire — Total Block Out Screening · per metre, per four-week block × 1SC-BLOK 274 m $1.75 $479.50
Continuation of hire — Site Safety Sign · per unit, per four-week block × 1SIGN-SITE 9 $4.50 $40.50
Continuation of hire — Vehicle Gate — 6m Double Swing · per unit, per four-week block × 1GT-VEH 2 $48.00 $96.00
Subtotal ex GST
$1,834.24
GST 10%
$183.42
Total due
$2,017.66
Payment
NAB · BSB 086-006 · Account 44 921 8807
All Fence U Rent Pty Ltd
Please quote INV-26-1077 as the reference.
Notes
Hire continued past the agreed period · worked on what is on site today, not what was quoted

All Fence U Rent Pty Ltd · ABN 24 128 604 973 · 80 Collingwood St, Osborne Park WA 6017 · 0408 877 300 · hire@allfenceurent.com.au

Amount

$2,017.66
$1,834.24 ex GST + $183.42 GST
Kind
Continuation of hire
Lines
4
Terms
30 days EOM
Xero
INV-9071
Why this is the amount

The agreed period ended 03 Aug 2026 and the equipment is still on site. This is the per-metre-per-block rate applied to what was standing there over 03 Aug 2026 – 31 Aug 2026 — the running total, not the original quantity.