J-26-0131
On site Continuation of hireBentley Technology Park — Building C · Sarich Way, Bentley 6102 · Standard Braced · Building & construction
On site right now
the sum of every completed movement on this job — not the estimate, not the load 271 m · 496 units| Item | Estimated | Loaded | Installed | Since install | On site now | Hire /block |
|---|---|---|---|---|---|---|
| TF-BRC Temporary Fence — Standard Braced | 237.6 m | 324 m | 307.2 m | −36 m | 271.2 m | $2.35 |
| BRC-KIT Bracing Kit | 32 | 42 | 38 | +6 | 44 | — |
| FT-PLAS Fence Foot — Plastic Filled | 215 | 268 | 241 | — | 241 | — |
| CLP-STD Fence Clamp — Standard | 205 | 235 | 202 | — | 202 | — |
| SIGN-SITE Site Safety Sign | 4 | 5 | 4 | — | 4 | $4.50 |
| GT-PED Pedestrian Gate Panel | 2 | 3 | 3 | — | 3 | $14.50 |
| GT-VEH Vehicle Gate — 6m Double Swing | 1 | 2 | 2 | — | 2 | $48.00 |
| Fence, metres | 238 m | 324 m | 307 m | −36 m | 271 m |
They asked for 238 m, the yard sent 324 m so the crew would not run short, and 307 m went in. The install invoice bills the installed figure — $4,169.98 ex GST, against $3,166.84 had it been billed on the estimate (+$1,003).
How it got there
3 completed visits since 29 June 2026.
The hire
- Booked
- 12 June 2026
- Installed
- 29 June 2026
- Agreed period
- 3 blocks · 12 weeks
- Off hire due
- 21 Sept 20266 days ago
- Site contact
- Priya Nandakumar0455 771 209
- Their PO
- JAXN-21091
- Booked by
- AL
Continuation of hire
past 21 Sept 2026 by 1 block · 4 weeks — charged per metre, per four-week block, on what is on site now| Item | On site | Rate | Per block | × 1 |
|---|---|---|---|---|
| GT-PED Pedestrian Gate Panel | 3 | $14.50 / unit / month | $43.50 | $43.50 |
| GT-VEH Vehicle Gate — 6m Double Swing | 2 | $48.00 / unit / month | $96.00 | $96.00 |
| SIGN-SITE Site Safety Sign | 4 | $4.50 / unit / month | $18.00 | $18.00 |
| TF-BRC Temporary Fence — Standard Braced | 271.2 m | $2.35 / m / month | $637.32 | $637.32 |
| Accrued and not yet raised | $794.82 | $794.82 | ||
Site visits
every trip a crew has made or is booked to make — each one moves the running total| Visit | Type | Date | Crew | Status | What moved | Net metres | Invoice |
|---|---|---|---|---|---|---|---|
| SV-26-0417 docket D40309 | Install | 29 June 2026 AM | CREW-4 | Completed | +307.2 m TF-BRC +38 BRC-KIT +241 FT-PLAS +202 CLP-STD +3 | +307.2 m | INV-26-1035 |
| SV-26-0418 docket D40310 | Collect | 13 July 2026 PM | CREW-5 | Completed | −88.8 m TF-BRC | −88.8 m | INV-26-1036 |
| SV-26-0419 docket D40311 | Add | 30 July 2026 AM | CREW-1 | Completed | +52.8 m TF-BRC +6 BRC-KIT | +52.8 m | |
| SV-26-0469 docket D41882 | Collect | 14 Aug 2026 PM | CREW-3 | On site | −84 m TF-BRC | −84 m | — |
| SV-26-0491 | Add | 20 Aug 2026 AM | No crew | Scheduled | +43.2 m TF-BRC +14 BRC-KIT | +43.2 m | — |
2 visits still open. Some have no crew on them — put them on one from the run sheet.
Invoices raised on this job
Account customer — invoiced on 30 days EOM| Invoice | What for | Issued | Period | Status | Ex GST |
|---|---|---|---|---|---|
| INV-26-1035 | Install | 29 June 2026 | 29 June – 21 Sept | Overdue | $4,169.98 |
| INV-26-1036 | Variation | 13 July 2026 | 13 July – — | Sent | $185.00 |
| Billed on this job · $0.00 of it paid | $4,354.98 | ||||
Customer
- Contact
- Trent Boag
- Phone
- 08 9382 3300
- ABN
- 45 009 322 918
- Segment
- Building & construction
Account customer, so this job is invoiced once the install is done and falls due on 30 days eom.
Photos and paperwork
4 photos off the crews' iPads, and every docket raised against this site| Docket | Visit | When | Crew | Signed on site by | State | |
|---|---|---|---|---|---|---|
| D40309 | SV-26-0417 Install | 29 June 2026 | CREW-4 | Priya Nandakumar | Approved | |
| D40310 | SV-26-0418 Collect | 13 July 2026 | CREW-5 | Priya Nandakumar | Approved | |
| D40311 | SV-26-0419 Add | 30 July 2026 | CREW-1 | Priya Nandakumar | Approved | |
| D41882 | SV-26-0469 Collect | 14 Aug 2026 | CREW-3 | Priya Nandakumar | Submitted | |
| — | SV-26-0491 Add | 20 Aug 2026 | — | — | Not started |
Everything here is held with the job, not in a folder somewhere — so it is still attached to this site in two years when somebody asks what the frontage looked like before the crew started.