SV-26-0417
Install CompletedVisit 1 of 12 on J-26-0131 · Bentley Technology Park — Building C, Bentley
All Fence U Rent Pty Ltd · ABN 24 128 604 973
80 Collingwood St, Osborne Park WA 6017
0408 877 300 · hire@allfenceurent.com.au
100% WA owned and operated
80 Collingwood St, Osborne Park WA 6017
0408 877 300 · hire@allfenceurent.com.au
100% WA owned and operated
Install docket
SV-26-0417
22 June 2026
Docket D40309
Site
Bentley Technology Park — Building C
Sarich Way
Bentley WA 6102
Site contact Priya Nandakumar · 0455 771 209
Bentley WA 6102
Site contact Priya Nandakumar · 0455 771 209
Customer
Jaxon Construction Pty Ltd
ABN 45 009 322 918
Trent Boag
08 9382 3300
Trent Boag
08 9382 3300
Job
J-26-0131
Crew
CREW-4Cam
Truck
1HDN 621
Completed
23 June 2026, 8:08 am
| Item | Description | Out to site | Back to yard | Condition | On site after |
|---|---|---|---|---|---|
| TF-BRC | Temporary Fence — Standard Braced 2.4m × 1.8m panel with bracing stay and second foot every third panel | 218.4 m | — | Good | 208.8 m |
| BRC-KIT | Bracing Kit Stay, second foot and two clamps, made up in the yard | 30 | — | Good | 20 |
| FT-PLAS | Fence Foot — Plastic Filled 27kg plastic-filled fence foot, twin-slot | 212 | — | Good | 212 |
| CLP-STD | Fence Clamp — Standard Galvanised panel clamp, 17mm bolt | 183 | — | Good | 183 |
| SIGN-SITE | Site Safety Sign 600 × 450 site safety sign, cable-tied to the run | 6 | — | Good | 6 |
| GT-PED | Pedestrian Gate Panel 1.2m pedestrian gate panel, self-closing hinge, padlock hasp | 3 | — | Good | 3 |
| GT-VEH | Vehicle Gate — 6m Double Swing 6m double swing vehicle gate, drop bolts, wheeled leaf | 2 | — | Good | 2 |
| Fence, metres | 218 m | — | 209 m | ||
Crew signature
Site signature
Date
All Fence U Rent Pty Ltd · ABN 24 128 604 973 · 80 Collingwood St, Osborne Park WA 6017 · 0408 877 300. The quantities on this docket are what gets invoiced. Equipment remains the property of All Fence U Rent Pty Ltd for the duration of the hire; anything not returned is charged at the replacement rate.
What this visit changes
Posted on 23 June 2026, 8:08 am. It put 218 m out and brought nothing back, which is why J-26-0131 now shows 209 m on site.
- Movements posted
- 7
- Yard adjusted
- 7 lines
- Docket
- D40309
- Invoice
- INV-26-1032
The rest of this job
Open → SV-26-0417 Install 22 June 2026 SV-26-0418 Collect 05 July 2026 SV-26-0419 Add 19 July 2026 SV-26-0466 Collect 09 Aug 2026 SV-26-0470 Add 09 Aug 2026 SV-26-0474 Add 10 Aug 2026 SV-26-0478 Collect 11 Aug 2026 SV-26-0482 Inspection 12 Aug 2026 SV-26-0486 Collect 13 Aug 2026 SV-26-0490 Collect 16 Aug 2026 SV-26-0494 Add 17 Aug 2026 SV-26-0498 Add 23 Aug 2026