INV-26-1054
Install Paid Xero INV-9048Main Roads Western Australia · J-26-0147 Great Eastern Highway — Bilgoman Realignment
All Fence U Rent Pty Ltd · ABN 24 128 604 973
80 Collingwood St, Osborne Park WA 6017
0408 877 300 · hire@allfenceurent.com.au
100% WA owned and operated
80 Collingwood St, Osborne Park WA 6017
0408 877 300 · hire@allfenceurent.com.au
100% WA owned and operated
Tax invoice
INV-26-1054
13 Nov 2025
Period 13 Nov 2025 – 13 Jan 2026
Invoice to
Main Roads Western Australia
Priya Raghavan
Don Aitken Centre, Waterloo Cr
East Perth WA 6004
ABN 50 860 676 021
Don Aitken Centre, Waterloo Cr
East Perth WA 6004
ABN 50 860 676 021
Site
Great Eastern Highway — Bilgoman Realignment
Great Eastern Hwy
Glen Forrest WA 6071
Job J-26-0147 · your PO MRLA-21203
Standard Braced with Total Block Out
Glen Forrest WA 6071
Job J-26-0147 · your PO MRLA-21203
Standard Braced with Total Block Out
Issued
13 Nov 2025
Terms
30 days EOM
Due
30 Nov 2025
Status
Paid 14 Dec 2025
Delivery
Truck to site and back. $220.00| Description | Qty | Unit | Amount |
|---|---|---|---|
| Delivery & cartage — Perth metroDEL-METRO | 1 | $220.00 | $220.00 |
Install
Charged on the quantity the crew actually installed. $1,601.55| Description | Qty | Unit | Amount |
|---|---|---|---|
| Install — Temporary Fence — Standard BracedTF-BRC | 432 m | $2.10 | $907.20 |
| Install — Total Block Out ScreeningSC-BLOK | 417 m | $1.55 | $646.35 |
| Install — Vehicle Gate — 6m Double SwingGT-VEH | 2 | $24.00 | $48.00 |
Hire
The agreed hire period, paid up front. $3,744.90| Description | Qty | Unit | Amount |
|---|---|---|---|
| Hire — Temporary Fence — Standard Braced · 2 monthsTF-BRC | 432 m | $4.70 | $2,030.40 |
| Hire — Total Block Out Screening · 2 monthsSC-BLOK | 417 m | $3.50 | $1,459.50 |
| Hire — Site Safety Sign · 2 monthsSIGN-SITE | 7 | $9.00 | $63.00 |
| Hire — Vehicle Gate — 6m Double Swing · 2 monthsGT-VEH | 2 | $96.00 | $192.00 |
Final collection
Charged now so that if nothing else happens on site, the job is paid in full. $1,250.70| Description | Qty | Unit | Amount |
|---|---|---|---|
| Final collection — Temporary Fence — Standard BracedTF-BRC | 432 m | $1.75 | $756.00 |
| Final collection — Total Block Out ScreeningSC-BLOK | 417 m | $1.10 | $458.70 |
| Final collection — Vehicle Gate — 6m Double SwingGT-VEH | 2 | $18.00 | $36.00 |
- Subtotal ex GST
- $6,817.15
- GST 10%
- $681.72
- Total due
- $7,498.87
- Paid 14 Dec 2025
- $7,498.87
Payment
NAB · BSB 086-006 · Account 44 921 8807
All Fence U Rent Pty Ltd
Please quote INV-26-1054 as the reference.
All Fence U Rent Pty Ltd
Please quote INV-26-1054 as the reference.
Notes
The final collection is included on this invoice. If no further visit is needed, this job is paid in full.
All Fence U Rent Pty Ltd · ABN 24 128 604 973 · 80 Collingwood St, Osborne Park WA 6017 · 0408 877 300 · hire@allfenceurent.com.au
Amount
$7,498.87
$6,817.15 ex GST + $681.72 GST
- Kind
- Install
- Lines
- 11
- Terms
- 30 days EOM
- Xero
- INV-9048
Why this is the amount
Billed on the quantity the crew installed, not on the estimate that went out on the truck. The final collection is already on it, so if nothing else happens on this site the job is paid in full from day one. If it runs past 2 months, continuation of hire picks up from 13 Jan 2026.
See the estimated / loaded / installed columns →