INV-26-1010
Install Paid Xero INV-9004Georgiou Group Pty Ltd · J-26-0119 Tonkin Gap — Guildford Rd Interchange
All Fence U Rent Pty Ltd · ABN 24 128 604 973
80 Collingwood St, Osborne Park WA 6017
0408 877 300 · hire@allfenceurent.com.au
100% WA owned and operated
80 Collingwood St, Osborne Park WA 6017
0408 877 300 · hire@allfenceurent.com.au
100% WA owned and operated
Tax invoice
INV-26-1010
06 Apr 2026
Period 06 Apr 2026 – 06 July 2026
Invoice to
Georgiou Group Pty Ltd
Dane Mitchelson
68 Hasler Rd
Osborne Park WA 6017
ABN 88 009 253 202
68 Hasler Rd
Osborne Park WA 6017
ABN 88 009 253 202
Site
Tonkin Gap — Guildford Rd Interchange
Tonkin Hwy at Guildford Rd
Bayswater WA 6053
Job J-26-0119 · your PO GEOR-21007
Standard Braced with Total Block Out
Bayswater WA 6053
Job J-26-0119 · your PO GEOR-21007
Standard Braced with Total Block Out
Issued
06 Apr 2026
Terms
30 days EOM
Due
30 Apr 2026
Status
Paid 26 May 2026
Delivery
Truck to site and back. $220.00| Description | Qty | Unit | Amount |
|---|---|---|---|
| Delivery & cartage — Perth metroDEL-METRO | 1 | $220.00 | $220.00 |
Install
Charged on the quantity the crew actually installed. $2,163.58| Description | Qty | Unit | Amount |
|---|---|---|---|
| Install — Temporary Fence — Standard BracedTF-BRC | 580.8 m | $2.10 | $1,219.68 |
| Install — Total Block Out ScreeningSC-BLOK | 578 m | $1.55 | $895.90 |
| Install — Vehicle Gate — 6m Double SwingGT-VEH | 2 | $24.00 | $48.00 |
Hire
The agreed hire period, paid up front. $7,552.14| Description | Qty | Unit | Amount |
|---|---|---|---|
| Hire — Temporary Fence — Standard Braced · 3 monthsTF-BRC | 580.8 m | $7.05 | $4,094.64 |
| Hire — Total Block Out Screening · 3 monthsSC-BLOK | 578 m | $5.25 | $3,034.50 |
| Hire — Site Safety Sign · 3 monthsSIGN-SITE | 10 | $13.50 | $135.00 |
| Hire — Vehicle Gate — 6m Double Swing · 3 monthsGT-VEH | 2 | $144.00 | $288.00 |
Final collection
Charged now so that if nothing else happens on site, the job is paid in full. $1,688.20| Description | Qty | Unit | Amount |
|---|---|---|---|
| Final collection — Temporary Fence — Standard BracedTF-BRC | 580.8 m | $1.75 | $1,016.40 |
| Final collection — Total Block Out ScreeningSC-BLOK | 578 m | $1.10 | $635.80 |
| Final collection — Vehicle Gate — 6m Double SwingGT-VEH | 2 | $18.00 | $36.00 |
- Subtotal ex GST
- $11,623.92
- GST 10%
- $1,162.39
- Total due
- $12,786.31
- Paid 26 May 2026
- $12,786.31
Payment
NAB · BSB 086-006 · Account 44 921 8807
All Fence U Rent Pty Ltd
Please quote INV-26-1010 as the reference.
All Fence U Rent Pty Ltd
Please quote INV-26-1010 as the reference.
Notes
The final collection is included on this invoice. If no further visit is needed, this job is paid in full.
All Fence U Rent Pty Ltd · ABN 24 128 604 973 · 80 Collingwood St, Osborne Park WA 6017 · 0408 877 300 · hire@allfenceurent.com.au
Amount
$12,786.31
$11,623.92 ex GST + $1,162.39 GST
- Kind
- Install
- Lines
- 11
- Terms
- 30 days EOM
- Xero
- INV-9004
Why this is the amount
Billed on the quantity the crew installed, not on the estimate that went out on the truck. The final collection is already on it, so if nothing else happens on this site the job is paid in full from day one. If it runs past 3 months, continuation of hire picks up from 06 July 2026.
See the estimated / loaded / installed columns →