INV-26-1015
Continuation of hire Sent Xero INV-9009Georgiou Group Pty Ltd · J-26-0119 Tonkin Gap — Guildford Rd Interchange
All Fence U Rent Pty Ltd · ABN 24 128 604 973
80 Collingwood St, Osborne Park WA 6017
0408 877 300 · hire@allfenceurent.com.au
100% WA owned and operated
80 Collingwood St, Osborne Park WA 6017
0408 877 300 · hire@allfenceurent.com.au
100% WA owned and operated
Tax invoice
INV-26-1015
06 Aug 2026
Period 06 July 2026 – 06 Aug 2026
Invoice to
Georgiou Group Pty Ltd
Dane Mitchelson
68 Hasler Rd
Osborne Park WA 6017
ABN 88 009 253 202
68 Hasler Rd
Osborne Park WA 6017
ABN 88 009 253 202
Site
Tonkin Gap — Guildford Rd Interchange
Tonkin Hwy at Guildford Rd
Bayswater WA 6053
Job J-26-0119 · your PO GEOR-21007
Standard Braced with Total Block Out
Bayswater WA 6053
Job J-26-0119 · your PO GEOR-21007
Standard Braced with Total Block Out
Issued
06 Aug 2026
Terms
30 days EOM
Due
31 Aug 2026
Status
Sent
Continuation
Per metre, per month, on the equipment standing on site — not on what was quoted. $2,972.20| Description | Qty | Unit | Amount |
|---|---|---|---|
| Continuation of hire — Temporary Fence — Standard Braced · per metre, per monthTF-BRC | 612 m | $2.35 | $1,438.20 |
| Continuation of hire — Total Block Out Screening · per metre, per monthSC-BLOK | 796 m | $1.75 | $1,393.00 |
| Continuation of hire — Site Safety Sign · per unit, per monthSIGN-SITE | 10 | $4.50 | $45.00 |
| Continuation of hire — Vehicle Gate — 6m Double Swing · per unit, per monthGT-VEH | 2 | $48.00 | $96.00 |
- Subtotal ex GST
- $2,972.20
- GST 10%
- $297.22
- Total due
- $3,269.42
Payment
NAB · BSB 086-006 · Account 44 921 8807
All Fence U Rent Pty Ltd
Please quote INV-26-1015 as the reference.
All Fence U Rent Pty Ltd
Please quote INV-26-1015 as the reference.
Notes
Hire continued past the agreed period
All Fence U Rent Pty Ltd · ABN 24 128 604 973 · 80 Collingwood St, Osborne Park WA 6017 · 0408 877 300 · hire@allfenceurent.com.au
Amount
$3,269.42
$2,972.20 ex GST + $297.22 GST
- Kind
- Continuation of hire
- Lines
- 4
- Terms
- 30 days EOM
- Xero
- INV-9009
Why this is the amount
The agreed period ended 06 July 2026 and the equipment is still on site. This is the per-metre-per-month rate applied to what was standing there over 06 July 2026 – 06 Aug 2026 — the running total, not the original quantity.
See the running total →