INV-26-1078

Continuation of hire Draft Xero INV-9072

Georgiou Group Pty Ltd · J-26-0119 Tonkin Gap — Guildford Rd Interchange

All Fence U Rent
All Fence U Rent Pty Ltd · ABN 24 128 604 973
80 Collingwood St, Osborne Park WA 6017
0408 877 300 · hire@allfenceurent.com.au
100% WA owned and operated
Tax invoice
INV-26-1078
14 Aug 2026
Period 03 Aug 2026 – 31 Aug 2026
Invoice to
Georgiou Group Pty Ltd
Dane Mitchelson
68 Hasler Rd
Osborne Park WA 6017
ABN 88 009 253 202
Site
Tonkin Gap — Guildford Rd Interchange
Tonkin Hwy at Guildford Rd
Bayswater WA 6053
Job J-26-0119 · your PO GEOR-21007
Standard Braced with Total Block Out
Issued
14 Aug 2026
Terms
30 days EOM
Due
01 Sept 2026
Status
Draft

Continuation

Per metre, per four-week block, on the equipment standing on site — not on what was quoted. $2,972.20
DescriptionQtyUnitAmount
Continuation of hire — Temporary Fence — Standard Braced · per metre, per four-week block × 1TF-BRC 612 m $2.35 $1,438.20
Continuation of hire — Total Block Out Screening · per metre, per four-week block × 1SC-BLOK 796 m $1.75 $1,393.00
Continuation of hire — Site Safety Sign · per unit, per four-week block × 1SIGN-SITE 10 $4.50 $45.00
Continuation of hire — Vehicle Gate — 6m Double Swing · per unit, per four-week block × 1GT-VEH 2 $48.00 $96.00
Subtotal ex GST
$2,972.20
GST 10%
$297.22
Total due
$3,269.42
Payment
NAB · BSB 086-006 · Account 44 921 8807
All Fence U Rent Pty Ltd
Please quote INV-26-1078 as the reference.
Notes
Hire continued past the agreed period · worked on what is on site today, not what was quoted

All Fence U Rent Pty Ltd · ABN 24 128 604 973 · 80 Collingwood St, Osborne Park WA 6017 · 0408 877 300 · hire@allfenceurent.com.au

Amount

$3,269.42
$2,972.20 ex GST + $297.22 GST
Kind
Continuation of hire
Lines
4
Terms
30 days EOM
Xero
INV-9072
Why this is the amount

The agreed period ended 06 July 2026 and the equipment is still on site. This is the per-metre-per-block rate applied to what was standing there over 03 Aug 2026 – 31 Aug 2026 — the running total, not the original quantity.